Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> hauling equipment with HMA. Do NOT use petroleum derivatives or other coating <br /> material that contaminate or alter the characteristics of the HMA. For live bed <br /> trucks, the conveyer shall be in operation during the process of applying the <br /> release agent. <br /> ' 5-04.3(3)C Pavers <br /> Provide HMA pavers that are self-contained, power-propelled units, with <br /> an internally heated vibratory screed and shall be capable of spreading and <br /> ' finishing courses of HMA plant mix material in lane widths required by the paving <br /> section shown in the Plans. <br /> Provide HMA paver in good condition and have the most current equipment <br /> ' available from the manufacturer for the prevention of segregation of the HMA <br /> mixture installed in good condition and in working order. Provide equipment <br /> certification listing the make, model, and year of the paver and note retrofitting of <br /> ' any equipment. <br /> Operate the screed in accordance with the manufacturer's recommendations and <br /> so it effectively produces a finished surface of the required evenness and texture <br /> without tearing, shoving, segregating, or gouging the mixture. Provide a copy of <br /> the manufacturer's recommendations upon City's request. Extensions producing <br /> the same results, including ride, density, and surface texture as obtained by the <br /> primary screed will be allowed. Do NOT use extensions without augers and an <br /> internally heated vibratory screed in the Traveled Way. <br /> When specified in the Contract, reference lines for vertical control will be required. <br /> Place lines on both outer edges of the Traveled Way of each Roadway. Horizontal <br /> ' control utilizing the reference line will be permitted. Control the grade and slope <br /> for intermediate lanes automatically from reference lines or by means of a mat <br /> referencing device and a slope control device. When the finish of the grade <br /> prepared for paving is superior to the established tolerances and when, in the <br /> opinion of the Engineer, further improvement to the line, grade, cross-section, and <br /> smoothness can best be achieved without the use of the reference line, a mat <br /> referencing device may be substituted for the reference line. Substitution of the <br /> device will be subject to the continued approval of the Engineer. A joint matcher <br /> may be used subject to the approval of the Engineer. The reference line may be <br /> removed after the completion of the first course of HMA when approved by the <br /> ' Engineer. Whenever the Engineer determines that any of these methods are <br /> failing to provide the necessary vertical control, the reference lines will be <br /> reinstalled by the Contractor. <br /> Furnish and install all pins, brackets, tensioning devices, wire, and accessories <br /> necessary for satisfactory operation of the automatic control equipment. <br /> If the paving machine in use is not providing the required finish, the Engineer may <br /> ' suspend Work as allowed by Section 1-08.6. Thoroughly remove any cleaning or <br /> solvent type liquids spilled on the pavement before paving proceeds. <br /> 5-04.3(3)D Material Transfer Device or Material Transfer Vehicle <br /> ' Provide a Material Transfer Device/Vehicle (MTDN) with the Engineer's approval, <br /> unless otherwise required by the Contract. <br /> Where an MTDN is required by the contract, the Engineer may approve paving <br /> without an MTDN, at the Contractor's request. The Engineer will determine if an <br /> equitable adjustment in cost or time is due. <br /> ' Water Main Replacement"V" Division 5-SURFACE TREATMENTS April,2021 <br /> WO No.-UP3730 AND PAVEMENTS <br /> SP-149 <br />