Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Mix the MTD/V when used with the HMA after delivery by the hauling equipment <br /> and prior to laydown by the paving machine. Sufficiently mix the HMA to obtain a <br /> uniform temperature throughout the mixture. The length of the windrow for <br /> windrow elevator may be limited in urban areas or through intersections at the <br /> discretion of the Engineer. <br /> To be approved for use, provide an MTV meeting the following: <br /> 1. Self-propelled vehicle, separate from the hauling vehicle or paver. <br /> 2. Not be connected to the hauling vehicle or paver. <br /> 3. May accept HMA directly from the haul vehicle or pick up HMA from a <br /> windrow. <br /> 4. Ability to mix the HMA after delivery by the hauling equipment and prior to <br /> placement into the paving machine. <br /> 5. Ability to mix the HMA sufficiently to obtain a uniform temperature <br /> throughout the mixture. <br /> To be approved for use, provide an MTD meeting the following: <br /> 1. Ability to be positively connected to the paver. <br /> 2. May accept HMA directly from the haul vehicle or pick up HMA from a <br /> windrow. <br /> 3. Ability to mix the HMA after delivery by the hauling equipment and prior to <br /> placement into the paving machine. <br /> 4. Ability to mix the HMA sufficiently to obtain a uniform temperature <br /> throughout the mixture. <br /> 5-04.3(3)E Rollers <br /> Provide vibratory, oscillatory steel wheel rollers, or pneumatic tire type rollers, in <br /> good condition and capable of reversing without backlash. Operate roller in <br /> accordance with the manufacturer's recommendations. When ordered by the <br /> Engineer for any roller planned for use on the project, provide a copy of the <br /> manufacturer's recommendation for the use of that roller for compaction of HMA. <br /> Provide sufficient number and weight of rollers to compact the mixture in <br /> compliance with the requirements of Section 5-04.3(10). The use of equipment <br /> that results in crushing of the aggregate will not be permitted. Rollers producing <br /> pickup, washboard, uneven compaction of the surface, displacement of the <br /> mixture or other undesirable results will not be permitted. <br /> 5-04.3(4) Preparation of Existing Paved Surfaces <br /> Bring any irregular existing pavement surface or old base surface to a uniform <br /> grade and cross-section as shown on the Plans or approved by the Engineer. <br /> Accomplish preleveling of uneven or broken surfaces over which HMA is to be <br /> placed by using an asphalt paver, a motor patrol grader, or by hand raking, as <br /> approved by the Engineer. <br /> Provide compaction of preleveling HMA to the satisfaction of the Engineer and <br /> may require the use of small steel wheel rollers, plate compactors, or pneumatic <br /> rollers to avoid bridging across preleveled areas by the compaction equipment. <br /> Provide Engineer approved compaction equipment used for the compaction of <br /> preleveling HMA. <br /> Clean the entire surface of the pavement before construction of HMA on an <br /> existing paved surface. Entirely remove all fatty asphalt patches, grease <br /> drippings, and other objectionable matter from the existing pavement. Thoroughly <br /> clean all pavements or bituminous surfaces of dust, soil, pavement grindings, and <br /> Water Main Replacement"V" Division 5—SURFACE TREATMENTS April,2021 <br /> WO No.—UP3730 AND PAVEMENTS <br /> SP-150 <br />