My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Size recycled asphalt pavement (RAP) utilized in the production of HMA prior to <br /> entering the mixer to produce a uniform and thoroughly mixed HMA. If there is <br /> evidence of the recycled asphalt pavement not breaking down during the heating <br /> and mixing of the HMA, immediately suspend the use of the RAP until Engineer <br /> approves changes necessary to provide adequate RAP breakdown and mixing. <br /> After introducing the required amount of mineral materials, RAP, new asphalt <br /> binder and asphalt rejuvenator into the mixer, mix the HMA until complete and <br /> ' uniform coating of the particles and thorough distribution of the asphalt binder <br /> throughout the mineral materials, and RAP is ensured. <br /> 5-04.3(7) Spreading and Finishing <br /> Lay the mixture upon an approved surface, spread, and strike off to the <br /> established grade and elevation. Provide HMA pavers complying with Section 5- <br /> 04.3(3) to distribute the mixture. Unless Engineer directs otherwise, provide the <br /> nominal compacted layer depth to NOT exceed the following: <br /> HMA Class Course Maximum <br /> Compacted Layer <br /> Depth (FT) <br /> 1 inch NA 0.35 <br /> 3/4 & 1/2 inch Wearing 0.30 <br /> 3/4 & 1/2 inch Other 0.35 <br /> 1 3/8 inch NA 0.15 <br /> On areas where irregularities or unavoidable obstacles make the use of <br /> mechanical spreading and finishing equipment impractical, the paving may be <br /> done with other equipment or by hand. <br /> When more than one JMF is being utilized to produce HMA, place the material <br /> produced for each JMF using separate spreading and compacting equipment. Do <br /> NOT intermingle HMA produced from more than one JMF. During a work shift <br /> place each strip of HMA to a single JMF established for the class of HMA <br /> specified, unless there is a need to make an adjustment in the JMF. <br /> 5-04.3(8) Aggregate Acceptance Prior to Incorporation in HMA <br /> For HMA accepted by nonstatistical evaluation the aggregate properties of sand <br /> equivalent, uncompacted void content and fracture will be evaluated in <br /> accordance with Section 3-04. Sampling and testing of aggregates for HMA <br /> accepted by commercial evaluation will be at the Engineer's option. <br /> 5-04.3(9) HMA Mixture Acceptance <br /> Engineer will use nonstatistical, or commercial evaluation for determining <br /> acceptance of HMA. <br /> Engineer will use nonstatistical evaluation for the HMA acceptance, unless <br /> Contract specifies Commercial Evaluation. <br /> Engineer will use Commercial evaluation for Commercial HMA and for other <br /> classes of HMA in the following applications: sidewalks, road approaches, paths, <br /> trails, temporary pavement, and pavement repair. Engineer will need to approve <br /> other nonstructural applications of HMA accepted by commercial evaluation. <br /> Sampling and testing of HMA accepted by commercial evaluation will be at the <br /> Engineer's option. <br /> Water Main Replacement"V" Division 5—SURFACE TREATMENTS April, 2021 <br /> WO No.—UP3730 AND PAVEMENTS <br /> SP-153 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.