My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> The mix design will be the initial JMF for the class of HMA. The Contractor may <br /> request a change in the JMF. Any adjustments to the JMF will require the <br /> Engineer's approval and may be made in accordance with this section. <br /> 5-04.3(9)A HMA Tolerances and Adjustments <br /> 1. Job Mix Formula Tolerances — Provide mixture at the time of <br /> acceptance within the following tolerances: <br /> For Asphalt Binder and Air Voids (Va), the acceptance limits are determined <br /> by adding the tolerances below to the approved JMF values. These values <br /> will also be the Upper Specification Limit (USL) and Lower Specification Limit <br /> (LSL) required in Section 1-06.2(2)D2. <br /> Property Non-Statistical Commercial <br /> Evaluation Evaluation <br /> Asphalt +/- 0.5% +/- 0.7% <br /> Binder <br /> Air Voids, Va 2.5% min. and 5.5% N/A <br /> max <br /> For Aggregates in the mixture: <br /> a. First, determine preliminary upper and lower acceptance limits by applying <br /> the following tolerances to the approved JMF. <br /> Aggregate Percent Non-Statistical Commercial Evaluation <br /> Passing Evaluation <br /> 1", 3/4", 1/", and 3/8" sieves +/- 6% +/- 8% <br /> No. 4 sieve +/-6% +/- 8% <br /> No. 8 Sieve +/- 6% +/-8% <br /> No. 200 sieve +/- 2.0% +/- 3.0% <br /> b. Second, adjust the preliminary upper and lower acceptance limits <br /> determined from step (a) the minimum amount necessary so that none of <br /> the aggregate properties are outside the control points in Section 9-03.8(6). <br /> The resulting values will be the upper and lower acceptance limits for <br /> aggregates, as well as the USL and LSL required in Section 1-06.2(2)D2. <br /> 2. Job Mix Formula Adjustments — An adjustment to the aggregate <br /> gradation or asphalt binder content of the JMF requires Engineer's <br /> approval. Adjustments to the JMF will only be considered if the change <br /> produces material of equal or better quality and may require the <br /> development of a new mix design if the adjustment exceeds the <br /> amounts listed below. <br /> a. Aggregates — 2 percent for the aggregate passing the 11/2", 1", <br /> 3/" 1/2" %", and the No. 4 sieves, 1 percent for aggregate <br /> passing the No. 8 sieve, and 0.5 percent for the aggregate <br /> passing the No. 200 sieve. Provide the adjusted JMF within the <br /> range of the control points in Section 9-03.8(6). <br /> b. Asphalt Binder Content—The Engineer may order or approve <br /> changes to asphalt binder content. The maximum adjustment <br /> from the approved mix design for the asphalt binder content is <br /> 0.3 percent. <br /> Water Main Replacement"V" Division 5—SURFACE TREATMENTS April,2021 <br /> WO No.—UP3730 AND PAVEMENTS <br /> SP-154 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.