Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 5-04.3(9)A Vacant <br /> 5-04.3(9)B Vacant <br /> 5-04.3(9)C Mixture Acceptance- Nonstatistical Evaluation <br /> The City will evaluate the HMA mixture accepted by Nonstatistical Evaluation <br /> by dividing the HMA tonnage into lots. <br /> 5-04.3(9)C1 Mixture Nonstatistical Evaluation - Lots and Sublots <br /> A lot is represented by randomly selected samples of the same mix <br /> design being tested for acceptance. A lot is defined as the total quantity <br /> of material or work produced for each Job Mix Formula placed. Only one <br /> lot per JMF is expected. A sublot will be equal to one day's production or <br /> 800 tons, whichever is less; except, the final sublot will be a minimum of <br /> 400 tons and may be increased to 1200 tons. <br /> Collectively evaluate all test results obtained from the acceptance <br /> samples from a given lot. If the Contractor requests a change to the JMF <br /> that is approved, the material produced after the change will be <br /> evaluated on the basis of the new JMF for the remaining sublots in the <br /> current lot and for acceptance of subsequent lots. For a lot in progress <br /> with a CPF less than 0.75, a new lot will begin at the Contractor's request <br /> after the Engineer is satisfied that material conforming to the <br /> Specifications can be produced. <br /> Perform sampling and testing for evaluation on the frequency of one <br /> sample per sublot. <br /> 5-04.3(9)C2 Mixture Nonstatistical Evaluation Sampling <br /> Obtain samples for acceptance testing when ordered by the Engineer. <br /> Sample the HMA mixture in the presence of the Engineer and in <br /> accordance with AASH-TO T 168. Take a minimum of three samples for <br /> each class of HMA placed on a project. If used in a structural application, <br /> test at least one of the three samples taken. <br /> Sampling and testing HMA in a Structural application where quantities <br /> are less than 400 tons is at the Engineer's discretion. <br /> For HMA used in a structural application and with a total project quantity <br /> less than 800 tons but more than 400 tons, preform a minimum of one <br /> acceptance test. In all cases, obtain a minimum of three samples at the <br /> point of acceptance. Test a minimum of one of the three samples for <br /> conformance to the JMF: <br /> a. If the test results are found to be within specification <br /> requirements, additional testing will be at the Engineer's <br /> discretion. <br /> 5-04.3(9)C3 Mixture Nonstatistical Evaluation -Acceptance Testing <br /> Testing of HMA for compliance of Va will be the City's option. If tested, <br /> compliance of Va will use WSDOT SOP 731. <br /> Testing for compliance of asphalt binder content will be by WSDOT FOP <br /> for AASHTO T 308. <br /> Testing for compliance of gradation will be by FOP for WAQTC T 27/T 11. <br /> 5-04.3(10) HMA Compaction Acceptance <br /> Compact HMA mixture accepted by nonstatistical evaluation being used in <br /> traffic lanes; including lanes for intersections, ramps, truck climbing, weaving, <br /> Water Main Replacement"V" Division 5-SURFACE TREATMENTS April,2021 <br /> WO No.-UP3730 AND PAVEMENTS <br /> SP-155 <br /> I <br />