Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 Provide traffic control in accordance with Engineer's direction. Failure by <br /> the Contractor to provide the requested traffic control will result in <br /> forfeiture of the request for cores. If the CPF for the lot based on the <br /> results of the HMA cores is less than 1.00, the City will deduct the cost <br /> for the coring from any monies due or that may become due the <br /> Contractor under the Contract at the rate of $200 per core. In addition, <br /> the cost of the traffic control will also be the Contractor's responsibility. <br /> 5-04.3(10)B HMA Compaction — General Compaction Requirements <br /> Compact mixture only when the mixture is in the proper condition so that <br /> no undue displacement, cracking, or shoving occurs. Compact areas <br /> inaccessible to large compaction equipment by other mechanical means. <br /> Remove and replace HMA that becomes loose, broken, contaminated, <br /> shows excess or deficiency of asphalt, or is in any way defective, with <br /> new hot mix. Immediately compact to conform to the surrounding area. <br /> Provide type of rollers and their relative position in the compaction <br /> sequence to attain the specified densities. Operate rollers shall only in <br /> the static mode when the internal temperature of the mix is less than <br /> 175°F unless Engineer approves otherwise. Do NOT operate a roller, <br /> regardless of mix temperature, in a mode that results in checking or <br /> cracking of the mat. Only operate rollers in static mode on bridge decks. <br /> 5-04.3(10)C HMA Compaction — Cyclic Density <br /> Low cyclic density areas are defined as spots or streaks in the pavement <br /> that are less than 90 percent of the theoretical maximum density. At the <br /> Engineer's discretion, the Engineer may evaluate the HMA pavement for <br /> low cyclic density and when doing so will follow WSDOT SOP 733. A <br /> $500 Cyclic Density Price Adjustment will be assessed for any 500-foot <br /> section with two or more density readings below 90 percent of the <br /> theoretical maximum density. <br /> 5-04.3(10)D Vacant <br /> 5-04.3(10)E HMA Nonstatistical Compaction <br /> 5-04.3(10)E1 HMA Nonstatistical Compaction — Lots and <br /> Sublots <br /> City will perform acceptance testing on HMA compaction that is <br /> accepted by nonstatistical evaluation by dividing the project into <br /> compaction lots. <br /> A lot is represented by randomly selected samples of the same mix <br /> design that will be tested for acceptance. A lot is defined as the total <br /> quantity of material or work produced for each Job Mix Formula <br /> placed. Only one lot per JMF is expected. A sublot is equal to one <br /> day's production or 400 tons, whichever is less, except; the final <br /> sublot will be a minimum of 200 tons and may be increased to 800 <br /> tons. Testing for compaction will be at the rate of 5 tests per sublot <br /> per WSDOT T 738. <br /> Engineer will determine the sublot locations within each density lot. <br /> For a lot in progress with a CPF less than 0.75, Contractor may <br /> request a new lot begin after the Engineer is satisfied that material <br /> conforming to the Specifications can be produced. <br /> Water Main Replacement"V" Division 5—SURFACE TREATMENTS April,2021 <br /> WO No.—UP3730 AND PAVEMENTS <br /> SP-157 <br /> I <br />