My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> f <br /> Compact HMA mixture accepted by commercial evaluation and HMA <br /> constructed under conditions other than those listed above on the <br /> basis of a test point evaluation of the compaction train. Perform the <br /> test point evaluation in accordance with instructions from the <br /> Engineer. Use the number of passes with an approved compaction <br /> train required to attain the maximum test point density on all <br /> subsequent paving. <br /> Thoroughly compact HMA for preleveling. Compact HMA used to <br /> prelevel wheel ruts with a pneumatic tire roller unless Engineer <br /> approves. <br /> 5-04.3(10)E2 HMA Compaction Nonstatistical Evaluation — <br /> Acceptance Testing <br /> Engineer will randomly select the location of the HMA compaction <br /> acceptance tests from within each sublot, with one test per sublot. <br /> 5-04.3(10)E3 HMA Nonstatistical Compaction — Price <br /> Adjustments <br /> For each compaction lot with one or two sublots where all sublots <br /> attain a relative density that is 92 percent of the reference maximum <br /> density the HMA, City will accept at the unit Contract price with no <br /> further evaluation. If a sublot does not attain a relative density that <br /> is 92 percent of the reference maximum density, the City will <br /> evaluate the lot in accordance with Section 1-06.2 to determine the <br /> appropriate CPF, with the maximum CPF being 1.00. However, lots <br /> with a calculated CPF in excess of 1.00 will be used to offset lots <br /> with CPF values below 1.00 but greater than 0.90. Lots with CPF <br /> lower than 0.90 will be evaluated for compliance per 5-04.3(11). <br /> Additional testing by either a nuclear moisture-density gauge or <br /> cores will be completed as required to provide a minimum of three <br /> tests for evaluation. <br /> For compaction below the required 92% a Non-Conforming <br /> Compaction Factor (NCCF) will be determined. The NCCF equals <br /> the algebraic difference of CPF minus 1.00 multiplied by 40 percent. <br /> The Compaction Price Adjustment will be calculated as the product <br /> of CPF, the quantity of HMA in the compaction control lot in tons, and <br /> the unit Contract price per ton of mix. <br /> 5-04.3(11) Reject Work <br /> 5-04.3(11)A Reject Work General <br /> City will reject defective or non-conforming Work. The Contractor may <br /> propose, in writing, alternatives to removal and replacement of rejected <br /> material. Engineer has sole discretion to determine acceptability of such <br /> alternative proposals. Submit corrective action proposal for Engineer <br /> approval for rejected HMA not conforming to the requirements in Section <br /> 1-06.2(2) and this specification. <br /> 5-04.3(11)B Rejection by Contractor <br /> The Contractor may, prior to sampling, elect to remove any defective <br /> material and replace it with new material. Any such new material will be <br /> sampled, tested, and evaluated for acceptance. <br /> Water Main Replacement"V" Division 5—SURFACE TREATMENTS April, 2021 <br /> WO No.—UP3730 AND PAVEMENTS <br /> SP-158 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.