Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> ' 5-04.3(12)B2 Paved Panel Joint Seal <br /> Construct the paved panel joint seal in accordance with the <br /> requirements specified in section 5-04.3(12)B1 and the following <br /> requirement: <br /> a. Clean and seal the existing joint between concrete panels in <br /> accordance with Section 5-01.3(8) and the details shown in the <br /> Standard Plans. <br /> 5-04.3(13) Surface Smoothness <br /> Provide the completed surface of all courses having uniform texture, smooth, <br /> uniform as to crown and grade, and free from defects of all kinds. Provide <br /> wearing course completed surface that does NOT vary more than 1/8 inch <br /> from the lower edge of a 10-foot straightedge placed on the surface parallel to <br /> the centerline. Provide the transverse slope of the wearing course completed <br /> surface that does NOT vary more than 1/4 inch in 10 feet from the rate of <br /> transverse slope shown in the Plans. <br /> When deviations in excess of the above tolerances are found that result from <br /> a high place in the HMA, correct the pavement surface using one of the <br /> following methods: <br /> a. Removal of material from high places by grinding with an <br /> approved grinding machine, or <br /> b. Removal and replacement of the wearing course of HMA, or <br /> c. By other method approved by the Engineer. <br /> Carry out defect correction until there are no deviations anywhere greater <br /> than the allowable tolerances. <br /> City will accept with a price adjustment deviations in excess of the above <br /> tolerances that result from a low place in the HMA and deviations resulting <br /> from a high place where corrective action, in the opinion of the Engineer, will <br /> not produce satisfactory results. The Engineer will deduct from monies due <br /> or that may become due to the Contractor the sum of $500.00 for each and <br /> every section of single traffic lane 100 feet in length in which any excessive <br /> deviations described above are found. <br /> When utility appurtenances such as manhole covers and valve boxes are <br /> located in the traveled way, adjust the utility appurtenances to the finished <br /> grade prior to paving. If Contractor requests, Engineer may waive this <br /> requirement or when the adjustment details provided in the project plan or <br /> specifications call for utility appurtenance adjustments after the completion of <br /> paving. <br /> 1 Include utility appurtenance adjustment discussions in the Pre-Paving <br /> planning (5-04.3(14)B3). Submit a written request to waive this requirement <br /> to the Engineer prior to the start of paving. <br /> 5-04.3(14) Planing (Milling) Bituminous Pavement <br /> Engineer must approve the planing plan. Hold, with Engineer, a pre-planing <br /> meeting prior to the start of any planing. See Section 5-04.3(14)B2 for <br /> information on planing submittals. <br /> Refer to the Plans for locations of existing surfacing being planed. <br /> Water Main Replacement"V" Division 5—SURFACE TREATMENTS April,2021 <br /> WO No.—UP3730 AND PAVEMENTS <br /> SP-161 <br />