I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> When intersections will be partially or totally blocked, provide <br /> adequately sized and noticeable signage alerting traffic of closures <br /> to come a minimum two Working Days in advance. Show on the <br /> traffic control plan the stationing of peace officers when signalization <br /> is or may be countermanded'Also show areas flaggers positioning. I <br /> Include, at a minimum, on the planing and paving plan: <br /> 1. A copy of the accepted traffic control plan, refer to Section 1- <br /> 10.2(2), detailing each day's traffic control as it relates to the I <br /> specific requirements of that day's planing and paving. <br /> Briefly describe the traffic control sequencing consistent with <br /> the proposed planing and paving sequence, and scheduling <br /> of placement of temporary pavement markings and <br /> channelizing devices after each day's planing, and paving. <br /> 2. A copy of each intersection's traffic control plan. <br /> 3. Haul routes from Supplier facilities and locations of <br /> temporary parking and staging areas, including return routes. <br /> Describe the complete round trip as it relates to the <br /> sequencing of paving operations. <br /> 4. Names and locations of HMA Supplier facilities to be used. <br /> 5. List of all equipment to be used for paving. <br /> 6. List of personnel and associated job classification assigned <br /> to each piece of paving equipment. <br /> 7. Description (geometric or narrative) of the planing and paving <br /> sequence schedule and intended area of planing and of <br /> paving for each day's work, the directions of proposed <br /> planing and paving, sequence of adjacent lane paving, <br /> sequence of skipped lane paving, intersection planing and <br /> paving scheduling and sequencing, and making of proposed <br /> timely notifications and coordination. Also show HMA joints <br /> relative to the final pavement marking lane lines. <br /> 8. Names,job titles, and contact information for field, office, and <br /> plant supervisory personnel. <br /> 9. A copy of the approved Mix Designs. <br /> 10. Tonnage of HMA to be placed each day. <br /> 11. Approximate times and days for starting and ending daily <br /> operations. <br /> 5-04.3(14)B3 Pre-Paving and Pre-Planing Briefing <br /> At least two Working Days before the first paving operation and the I <br /> first planing operation, or as scheduled by the Engineer for future <br /> paving and planing operations to ensure the Contractor has <br /> adequately prepared for notifying and coordinating as required in the <br /> Contract, the Contractor must be prepared to discuss that day's <br /> operations as they relate to other entities and to public safety and <br /> convenience, including driveway and business access, garbage <br /> truck operations, transit operations and working around energized <br /> overhead wires, school and nursing home and hospital and other <br /> accesses, other contractors who may be operating in the area, <br /> pedestrian and bicycle traffic, and emergency services. The <br /> Contractor, and Subcontractors that may be part of that day's <br /> operations must meet with the Engineer and discuss the proposed <br /> Water Main Replacement"V" Division 5—SURFACE TREATMENTS April, 2021 <br /> WO No.—UP3730 AND PAVEMENTS <br /> SP-164 <br /> I <br />