My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICITY OF EVERETT SPECIAL PROVISIONS <br /> I4. . Provide fertilizer and amendment and soil application depth <br /> recommendations from accredited soils laboratory, soil scientist or agronomist <br /> for the specified plant type. <br /> I 5. Mix samples. Provide two 1-quart samples of each soil mix. <br /> 6. Manufacturer. Provide manufacturer's certificate of compliance as specified in <br /> Section 1-06.3 — MANUFACTURER'S CERTIFICATE OF COMPLIANCE from <br /> I the soil mix Supplier and compost Supplier if different from soil mix Supplier. <br /> Include names and address on certificate. <br /> 7. Laboratory information. Include the following: <br /> I a. Name of laboratory including contact person, <br /> b. Address, <br /> c. Phone number of contact, <br /> Id. Email address of contact, <br /> e. Laboratory and personnel qualifications including current certification date <br /> by STA, ASTM,ASSHTO, or approved equal. <br /> 8. Acceptance of Soils Prior to Placement. Placement of any soils or soil mixes <br /> I specified in this Section will NOT be allowed until Engineer has reviewed and <br /> confirmed the following: <br /> a. Soil mix delivery tickets. Provide delivery tickets showing full delivered <br /> l <br /> soil amount matches product type, volume and Manufacturer named in <br /> the submittals. <br /> b. Visual inspection. Engineer will compare delivered product to product <br /> I submitted to very it matches the submitted sample. <br /> Engineer may inspect any loads of soil on delivery and stop placement if it is <br /> determined the delivered sol doesn't appear to match the submittals and require <br /> I sampling and testing of delivered soil before authorizing soil placement at sole cost to <br /> Contractor. <br /> 9-14.1(2) Topsoil Type A— Imported <br /> I Provide Topsoil Type A consisting of an imported sandy loam as defined by the United <br /> States Department of Agriculture Classification System, and documented by a particle <br /> size analysis performed by an accredited laboratory. <br /> I Provide Topsoil Type-A having an organic matter content of at least 5 percent by dry <br /> weight, as determined by Loss-on-Ignition test (ASTM D2974, or TMECC 05.07A) <br /> where turf will be installed and meeting the following requirements: <br /> I Nutrient Test Unit Range <br /> Phosphorous Bray mg/kg >20 <br /> Potassium NH4OAc mg/kg >175 <br /> I Boron DTPA mg/kg >0.5 <br /> Zinc DTPA mg/kg >5 <br /> Manganese DTPA mg/kg >20 <br /> I Iron DTPA mg/kg >20 <br /> Calcium NH4OAc mg/kg >6 <br /> Magnesium NH4OAc mg/kg >2 <br /> I Sodium NH4OAc mg/kg <2 <br /> Cation Exchange CEC meq/100g >6 <br /> pH 6.5 —7.5 <br /> I <br /> Nitrogen lbs/ac >200 <br /> In addition to meeting the particle size requirements of USDA sandy loam, Topsoil <br /> I <br /> Type-A must meet the following sieve Specifications: <br /> Sieve Size Percent Passing <br /> 1" 100 <br /> I Watermain Replacement"V" Division 9—MATERIALS <br /> SP—201 April, 2021 <br /> WO No.—UP3730 ADDENDUM#1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.