My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-09 WATER MAINS <br /> 7-09.1 Description <br /> Revise the first paragraph in 7-09.1 to read as follows: <br /> This Work consists of constructing water mains in accordance with the Plans, the <br /> Standard Specifications, these Special Provisions and the COE Standard Drawings, at <br /> the location shown on the Plans. <br /> 7-09.1(1) Definitions <br /> 7-09.1(1)D Pipe Zone Backfill I <br /> Revise the first paragraph in 7-09.1(1)D to read as follows: <br /> Pipe zone backfill includes material placed a minimum of 6-inches below the <br /> bottom of pipe up to a minimum of 12-inches above the top of pipe as shown <br /> on COE Standard Drawing No. 614 <br /> 7-09.2 Materials <br /> Substitute the following for the corresponding material in the material list in 7-09.2: r <br /> Polyethylene Encasement 9.30.1(2) Special Provisions <br /> Fittings 9-30.2 Special Provisions <br /> Restrained Joints 9-30.2(6) Special Provisions <br /> Bolted, Sleeve—Type Couplings 9-30.2(7) Special Provisions <br /> for Plain End Pipe <br /> Aggregates: I <br /> Pipe Zone Backfill 9-03.22 Special Provisions <br /> Controlled Density Fill 2.09.3(1)E Special Provisions <br /> 7-09.3 Construction Requirements <br /> 7-09.3(5) Grade and Alignment <br /> Revise the first sentence of the third paragraph in 7-09.3(5) to read as follows: <br /> Provide minimum cover from the final surface grade to the top of the pipe of 36- <br /> inches for water mains less than 12-inches in diameter and 48-inches for water <br /> mains 12-inches or greater in diameter. Provide 60-inches as the maximum depth <br /> from the final surface grade to the top of all water main pipes. Adhere to both <br /> minimum and maximum depths from finish grades unless Plans indicate otherwise. <br /> 7-09.3(7) Trench Excavation <br /> Revise the second paragraph in 7-09.3(7)to read as follows: <br /> Excavate bell holes to the extent necessary to permit accurate Work in making and <br /> inspecting the joints. Keep the banks of the trenches as nearly vertical as soil <br /> conditions will permit, and where required to control trench width or to protect <br /> adjacent Structures, sheet and brace the trench. Provide trench widths to 1 foot <br /> above the top of the pipe in accordance with COE Standard Drawing No. 614. <br /> Standard excavating equipment shall be adjusted so as to excavate the narrowest <br /> trench possible. <br /> 7-09.3(7)A Dewatering of Trench <br /> Supplement 7-09.3(7)A by adding the following: I <br /> Furnish, install, and operate necessary machinery, appliances, and equipment <br /> to keep excavations free from water during construction. <br /> Water Main Replacement"V" Division 7—STORM,SEWER,WATER April,2021 <br /> WO No.—UP3730 SP—172 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.