My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Provide traffic control and expose the water main at the connection allowing <br /> sufficient room for COE forces to make connection, expose the water main at <br /> the connection, including properly shoring and sheeting the excavation in <br /> accordance with requirements of WISHA, RCW 49.17 including WAC 296-155. <br /> Should City personnel determine the excavation and shoring and sheeting do <br /> not meet the requirements of WISHA, RCW 49.17, including WAC 296-155, <br /> City personnel will notify Contractor to make necessary modifications to bring <br /> the excavation and shoring into compliance prior to City personnel entering the <br /> trench. <br /> Repair damage to existing pipe caused by the Contractor's operations at <br /> Contractor's expense. <br /> Proceed continuously once Work is started on a connection without interruption <br /> and as rapidly as possible until completed. City will not permit shutoff of mains <br /> overnight, over weekends, or on holidays. <br /> Notify COE water customers affected by water shut off if the connection to the <br /> existing system involves turning off the water. Provide a minimum of 48-hours <br /> prior notice. The Engineer will advise which property owners to notify. <br /> Depending upon the number of water customers affected by a shut-off, <br /> Contractor may need to perform the connection during times other than normal <br /> working hours. Do NOT operate valves on the existing system. Only City <br /> Utilities Department personnel may operate water system valves. <br /> Refer to 7-12.3 of these Special Provisions for tapping assembly connections, <br /> if any. <br /> 7-09.3(21) Thrust Blocking <br /> Revise the first sentence of the first paragraph to read as follows: <br /> Place concrete thrust blocking, as noted on the Plans and described in these <br /> Special Provisions, at bends where new ductile iron pipe connects to existing cast <br /> iron pipe. 111 <br /> Supplement 7-09.3(21) by adding the following: <br /> Provide mechanical joint restraining devices in place of concrete blocking on all <br /> fittings connecting ductile iron pipe to ductile iron pipe. <br /> Where shown on the Plans or as allowed by the Engineer, provide concrete thrust <br /> blocking at bends, tees, plugs and crosses, including City installed fittings. Provide <br /> cast-in-place concrete thrust blocking having a minimum of 1/4-square foot bearing <br /> against the fitting and minimum two square feet bearing against undisturbed soil <br /> and be clear of joints so as to permit taking up or dismantling joint. Provide a <br /> minimum measurement of 12-inches between the pipe and the undisturbed bank <br /> for all poured in place concrete thrust blocking. Form concrete blocking and pour <br /> using commercial concrete. Place blocking between solid ground and the fitting to <br /> be anchored with the area bearing on the pipe and on the ground in each instance <br /> being as Shown or directed by the Engineer. Place the blocking, unless otherwise <br /> shown or directed, so that the pipe and fitting joints, including nuts and bolts, can <br /> be accessible for repair. <br /> 7-09.3(22) Blowoff Assemblies <br /> Revise the first paragraph under 7-09.3(22) to read as follows: <br /> Construct Blowoff Assemblies at the locations shown on the Plans and in <br /> accordance with COE Standard Drawing No. 511. <br /> 7-09.3(23) Hydrostatic Pressure Test <br /> Supplement 7-09.3(23) by adding the following: I <br /> Water Main Replacement"V" Division 7—STORM,SEWER,WATER April,2021 <br /> WO No.—UP3730 SP—174 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.