My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 8 — MISCELLANEOUS CONSTRUCTION <br /> ' 8-01 EROSION CONTROL <br /> 8-01.1 Description <br /> Revise the first paragraph in 8-01.1 to read as follows: <br /> This Work consists of furnishing, installing, maintaining, removing and disposing of high <br /> visibility fence, and water pollution and erosion control items in accordance with the <br /> Standard Specifications, these Special Provisions, as shown in the Plans, as shown on <br /> COE Standard Drawings, or as designated by the Engineer. <br /> 8-01.2 Materials <br /> ' Supplement the list of materials in 8-01.2 as follows: <br /> Biodegradable Erosion Control Blanket 9-14.5(2) <br /> ' 8-01.3 Construction Requirements <br /> 8-01.3(1) General <br /> Supplement 8-01.3(1) as follows: <br /> The Contractor shall be responsible for all Work required for compliance with the <br /> Construction Stormwater General Permit (CSWGP) including annual permit fees. <br /> Delete the first through eighth paragraphs and substitute the following: <br /> The Contractor shall install a high visibility fence along the site preservation lines <br /> when shown in the Plans or as instructed by the Engineer. <br /> Throughout the life of the project, the Contractor shall preserve and protect the <br /> ' delineated area, acting immediately to repair or restore any fencing damaged or <br /> removed. <br /> Controlling pollution, erosion, runoff, and related damage requires the Contractor <br /> to perform temporary Work items including but not limited to: <br /> 1. Providing ditches, berms, culverts, and other measures to control surface <br /> water. <br /> 2. Building dams, settling basins, energy dissipaters, and other measures, <br /> to control downstream flows. <br /> 3. Controlling underground water found during construction. <br /> ' 4. Covering or otherwise protecting slopes and stockpiles until permanent <br /> erosion-control measures are working. <br /> To the degree possible, the Contractor shall coordinate this temporary Work with <br /> permanent drainage and erosion control Work the Contract requires. <br /> All sediment control devices including, but not limited to, sediment ponds, perimeter <br /> silt fencing, or other sediment trapping BMPs shall be installed prior to any ground <br /> disturbing activity. Clearing, grubbing, excavation, borrow, or fill within the Right of <br /> Way shall never expose more erodible earth than as listed below: <br /> Western Washington Eastern Washington <br /> (West of the Cascade Mountain (East of the Cascade Mountain <br /> ' Crest) Crest) <br /> May 1 through 17 Acres April 1 through 17 Acres <br /> September 30 October 31 <br /> ' October 1 through April 30 5 Acres November 1 through <br /> March 31 5 Acres <br /> 8-01.3(1)A. Submittals <br /> Revise 8-01.3(1)A to read as follows: <br /> Water Main Replacement"V" Division 8—MISC CONSTRUCTION April,2021 <br /> ' WO No.—UP3730 SP—185 <br />
The URL can be used to link to this page
Your browser does not support the video tag.