My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 8 05 4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> 8-04.5 Payment <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES <br /> 8-06.1 Description <br /> Supplement 8-06.1 by adding the following: , <br /> This Work also includes concrete driveway slabs behind back of sidewalks and <br /> thickened sidewalk driveway approaches. <br /> 8-06.2 Materials , <br /> Supplement 8-06.2 by adding the following: <br /> Liquid Membrane-Forming Concrete Curing 9-23.2 Special Provisions <br /> Compounds <br /> Chemical Admixtures for Concrete 9-23.6 Special Provisions <br /> 8-06.3 Construction Requirements <br /> Delete the first two paragraphs of 8-06.3 and substitute the following: <br /> Provide Cement Concrete Driveway Type 1, 2 or 3 as the case may be in accordance <br /> with the Standard Specifications and Standard Plan No. 315, 316 and 317. Where <br /> driveways with depressed sidewalk are called for on the Plans, depress the sidewalk <br /> through the driveway area, providing a maximum 2 percent slope from back of sidewalk <br /> to the back of curb. Provide minimum six inch thick cement concrete driveways and <br /> sidewalk driveway approaches and construct using Commercial Concrete as specified <br /> in Section 6-02.3(2)B of the Standard Specifications. Provide concrete having a slump <br /> not exceeding 3-1/2-inches and having a minimum 28-day design strength of 4000 psi. <br /> Match concrete finishing for transitions to existing cement concrete driveways to the <br /> existing surface as closely as possible. <br /> Sawcut existing cement concrete driveways and butt joint the new pavement to the <br /> existing driveway. <br /> Prepare subgrade for driveways and having required compaction and providing a firm, <br /> unyielding subgrade acceptable to the Engineer. <br /> Provide forms for the straight sections of the driveway having a minimum thickness of 1 <br /> three inches and equal to the nominal depth of the concrete. Plywood or one inch lumber <br /> may be used on radii. Securely stake and block all forms to true line and grade. <br /> Protect the driveway against damage or defacement until acceptance by Owner. <br /> Remove and replace by the Contractor at his expense driveways that are not acceptable, <br /> in the opinion of the Engineer, because of damage or defacement. <br /> Before placing any concrete, have on the job site enough protective paper, or equivalent, 111 <br /> to cover the pour of an entire day in the event of rain or other unsuitable weather <br /> conditions. <br /> 8-06.4 Measurement <br /> Delete paragraphs in 8-06.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> Water Main Replacement"V" Division 8—MISC CONSTRUCTION April,2021 <br /> WO No.—UP3730 SP—194 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.