My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br /> I <br /> DRAFT <br /> Geotechnical Engineering Investigation <br /> City of Everett <br /> Proposed Water Main Replacement"V" <br /> UP No.3730 <br /> Everett,Washington <br /> I <br /> Project No.092-20006 <br /> MAY 7,2020 <br /> I <br /> Prepared for: <br /> CITY OF EVERETT <br /> ATTN:MR.RICHARD HEFTI,P.E. <br /> 3200 CEDAR STREET <br /> EVERETT,WASHINGTON 98201 <br /> I <br /> Prepared by: <br /> Krazan&Associates,Inc. <br /> Geotechnical Engineering Division <br /> 4303—198TH ST SW <br /> LYNNWOOD,WASHINGTON 98036 <br /> (425)485-5519 <br /> I <br /> I <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.