My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> I <br /> ==IKr'aZan & ASSOCIATES, INC. <br /> GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING <br /> CONSTRUCTION MATERIALS TESTING & INSPECTION <br /> May 7,2020 Krazan File No. 092-20006 <br /> DRAFT <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett,WA 98201 <br /> Attention: Mr.Richard Hefti,P.E. Email: RHefti@everettwa.gov <br /> RE: Geotechnical Engineering Investigation <br /> Water Main Replacement"V"—UP3730 <br /> Everett,WA <br /> Dear Mr.Hefti, <br /> We are pleased to submit the attached report titled"Geotechnical Engineering Investigation—City of Everett <br /> — Proposed Water Main Replacement "V"—UP No. 3730 —Everett, Washington". The report summarizes <br /> our explorations of the surface and subsurface conditions within the site and provides recommendations for <br /> the proposed water main installation. <br /> Ifyou have anyquestions,or if we can be of further assistance,pleasenot <br /> do hesitate to contact our office. <br /> Respectfully submitted, I <br /> KRAZAN&ASSOCIATES,INC. <br /> Michael D. Rundquist,P.E. <br /> Senior Project Manager <br /> JL:MR 1 <br /> I <br /> I <br /> I <br /> Krazan&Associates,Inc. <br /> Offices Serving The Western United States <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.