My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> KRAZAN&ASSOCIATES,INC. 1 <br /> KA Project No. 092-20006 <br /> DRAFT Geotechnical Engineering Investigation <br /> Everett Water Main"V" <br /> May 7,2020 <br /> Page No. 20 <br /> also this <br /> misinterpret t ' 'p s report. To reduce this risk,Krazan&Associates.Inc. should participate in pre-bid <br /> and preconstruction meetings,and provide construction observations during the site work. <br /> This report is a geotechnical engineering investigation with the purpose of evaluating the soil conditions <br /> in terms of project design. The scope of our services did not include any environmental site assessment <br /> for the presence or absence of hazardous and/or toxic materials in the soil, groundwater or atmosphere, <br /> or the presence of wetlands. Any statements or absence of statements, in this report or on any soils log <br /> regarding odors, unusual or suspicious items, or conditions observed are strictly for descriptive purposes <br /> and are not intended to convey engineering judgment regarding potential hazardous and/or toxic <br /> assessments. <br /> The geotechnical information presented herein is based upon professional interpretation utilizing f <br /> standard engineering practices and a degree of conservatism deemed proper for this project. It is not <br /> warranted that such information and interpretation cannot be superseded by future geotechnical <br /> developments. We emphasize that this report is valid for this project as outlined above, and should not <br /> be used for any other site. Our report is prepared for the exclusive use of our client. No other party <br /> may rely on the product of our services unless we agree in advance to such reliance in writing. 111 <br /> If you have any questions, or if we may be of further assistance, please do not hesitate to contact our <br /> office at(425)485-5519. <br /> Respectfully submitted, <br /> KRAZAN&ASSOCIATES,INC. <br /> --/--/2020 ' <br /> JL:MR <br /> 1 <br /> i <br /> I <br /> Krazan&Associates,Inc. <br /> Offices Serving The Western United States <br />
The URL can be used to link to this page
Your browser does not support the video tag.