My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 1 <br /> NOTES <br /> 1. ALL INSTALLED AIR GAPS MUST BE WA DOH <br /> APPROVED. <br /> NEAREST WALL,SIDE RIB 2. THE HEIGHT OF THE AIR GAP MUST MEET THE <br /> OR OBSTRUCTION POTABLE WATER SUPPLY CRITERIA IN TABLE A UNLESS OTHERWISE NOTED. <br /> 3. THE CITY UTILITIES DEPARTMENT MAY REQUIRE THE <br /> 5 v AIR GAP TO BE INCREASED IF INSTALLED WITHIN A <br /> BUILDING WHERE THE AIR PRESSURE IS ARTIFICIALLY <br /> MAINTAINED OR INCREASED. <br /> / EFFECTIVE /i N DISCHARGE TO 4. AIR GAPS LESS THAN 1 INCH SHALL BE APPROVED <br /> /,..... W OPENING NON-POTABLE <br /> a f WATER SYSTEM ONLY AS A PART OF A LISTED DEVICE THAT HAS BEEN <br /> OVERFLOW RIM-\ ¢ TESTED UNDER BACKSIPHONAGE CONDITIONS <br /> LPcc <br /> WITHIN A VACUUM OF A MINIMUM OF 25 INCHES <br /> OF MERCURY. <br /> / <br /> 1 5. TUBULAR SCREENS MAYBE ATTACHED OR THE <br /> 6—r r r r r r r r SUPPLY LINE OUTLET MAY BE CUT AT A 45`ANGLE. <br /> rrr _—. r —ter r _. r — i <br /> r r r r r r r r - /—\ — 6. HOSES AND BYPASSES ARE NOT ALLOWED. <br /> r ,--, � r r rr - — PUMP <br /> - 7. THE INSPECTION OF AIR GAPS SHALL BE INCLUDED <br /> r r r r - / .. IN THE YEARLY TESTING PROGRAM FOR BACKFLOW <br /> r r ,._../ r r r r r r <br /> r r r r r r r r r <br /> ifI> _� DEVICES. <br /> 3 <br /> 1 <br /> 0 <br /> 3 <br /> Y AIR GAP(INCHES) <br /> D IF W>3D IF W_<3D(SINGLE WALL)OR <br /> IF W<_4D(INTERSECTING WALLS) <br /> <0.5 INCH 1 1.5 <br /> <0.75INCH 1.5 2.25 <br /> >_1INCH zxD 3xo CITY OF EVERETT <br /> 0 <br /> 6 PUBLIC WORKS DEPARTMENT <br /> TABLE A <br /> �' " Yra SASS I R.HMI I TR RHELM I p 7,/RB <br /> WO M <br /> x e 03/07/2012 <br /> B AIR GAP FOR <br /> In MAKEUP TANK 519 <br /> I I <br /> MN 10111 MI MR all IlL1111 N 11111 111111 11111 N WM M 111111 MI an all EN Mill <br />
The URL can be used to link to this page
Your browser does not support the video tag.