My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SI — NB r NM 1 1 E all OM E OM — 1 r an an — M <br /> 1 1 <br /> NOTES <br /> O O 1. ALL TEST COCKS MUST HAVE BRASS PLUGS. <br /> 2. TEST COCKS MUST FACE UP OR SIDEWAYS WHICH <br /> EVER IS MORE ACCESSIBLE. <br /> iii 3. PROVIDE NON-SLIP SURFACE ON ACCESS HATCH <br /> z <br /> yk, <br /> IF VAULT IS LOCATED IN PEDESTRIAN WALKWAY. <br /> 3"MIN <br /> io <br /> � E' ;��� -/ <br /> � _ <br /> FLOW t 3"MIN <br /> z PARTS <br /> in A. WA STATE APPROVED DOUBLE CHECK VALVE <br /> — ASSEMBLY. <br /> B. IN NON-TRAFFIC AREAS USE: <br /> PRECAST CONCRETE VAULT(UTILITY VAULT CO <br /> 233-LA,OR APPROVED EQUAL)OR PLASTIC VALVE <br /> PLAN BOX(UTILITY VAULT CO 1324-12L OR APPROVED <br /> EQUAL) <br /> C. IN TRAFFIC AREAS: <br /> 0 <br /> 0 A TRAFFIC LOADED BOX MUST BE USED AND <br /> LOCATION APPROVED BY THE THE CITY OF <br /> I-a EVERETT PRIOR TO INSTALLATION. <br /> zQ 30 <br /> u> D. IF A DAYLIGHT DRAIN CANNOT BE PROVIDED THERE <br /> 'OaN> MUST BE A 4' MIN LAYER OF FREE DRAINING <br /> GRAVEL AT THE BOTTOM OF BOX. <br /> III—r11 II-11 _ <br /> r I\ I <br /> U E. <br /> FFOM IOS LLOW APUT OF X SO LONG AS <br /> TAEA FOR <br /> VALVE OPERATORICIENTRO AND A DCVA REPAIRED ORCH END <br /> 1 © MAINTENANCE. <br /> w <br /> o <br /> 6 i- i•*/ ;1 <br /> I- <br /> f N ' FLOW Z97. <br /> � <br /> 9 <br /> o e. Y7t <br /> 0 '� 3q �,x,� �, � .,< CITY OF EVERETT <br /> g �...r <br /> �� �F�� PUBLIC WORKS DEPARTMENT <br /> t, ELEVATION ""RYAHSA53 IR.HEET I vAU IIHELM I''"" RB 12/so/zone <br /> O DOUBLE CHECK VALVE <br /> ,8 ASSEMBLY 520 <br /> I (DCVA)FOR 2-1/2"&SMALLER SERVICE <br />
The URL can be used to link to this page
Your browser does not support the video tag.