My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I I <br /> OPTIONAL <br /> IF<40 MPH <br /> ROLL SPACING W20-7A W3-4 W20-4 W20-1 <br /> (MIN 50'MAX 100') <br /> WORK AREA WITH BE ONE LANE ROAD <br /> WORK <br /> PREPARED ROAD <br /> TO STOP AHEAD AHEAD <br /> TRUCK <br /> DOWNSTREAM TAPER WITH BUFFER SPACE <br /> (MIN So'MAX 100') FLASHING (SEE TABLE A) SEE SEE SEE <br /> —III BEACON r I NOTE 1 NOTE 1 NOTE 1 <br /> I I <br /> --.. <br /> SEE 4 SEE SEE <br /> NOTE 1 I NOTE 1 NOTE 1 _ <br /> .I t41 <br /> ROAD ONE LANE BE NOTES LEGEND <br /> PREPARED <br /> WORK AHEAD TO STOP 1. DISTANCE BETWEEN SIGNS SHALL BE 100'FOR ;1 CONE OR CHANNELIZING DEVICE SEE STANDARD <br /> RESIDENTIAL STREETS(25 MPH)AND 350'FOR DRAWING 713. <br /> ARTERIAL ROADWAYS. <br /> W20-1 W20-4 W3-4 W20-7A <br /> 2. FLASHING BEACON INSTALLED AT EACH SIGN FOR <br /> — OPTIONAL NIGHT-TIME USE(OPTIONAL). <br /> i IF<40MPH <br /> 3 3. DISTANCES MAY VARY AS APPROVED BY THE <br /> ENGINEER. <br /> TABLE A 4. SIGN SIZE PER MUTCD. <br /> e SPEED CONE SPACING BUFFER <br /> if'. 5. THIS PLAN IS PROVIDED AS A GUIDE ONLY.FOR <br /> (MPH) (FT) SPACING <br /> P., SPECIFIC INFORMATION ON TRAFFIC CONTROL PLANS <br /> & TANGENT TAPER (FT) SEE CURRENT MUTCD. <br /> 30 30 25 25 as5 <br /> CITY OF EVERETT <br /> o + PUBLIC WORKS DEPARTMENT <br /> 0 35 35 20 120 <br /> 8 y.. uu�nyy.. pp <br /> 40 40 170 w SASS I COREY HGT I FAITMILHELM I'ESH 02/28/2018 <br /> TRAFFIC CONTROL PLAN 3 45 45 220 2 LANE ROADWAY: <br /> g ONE LANE CLOSED WITH ALTERNATING 701 <br /> I I <br /> ONEWAY TRAFFIC AND SPOTTERS <br /> — — — — — — — — — — — — — — — — — — — <br />
The URL can be used to link to this page
Your browser does not support the video tag.