My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M NM <br /> I I <br /> ROLL SPACING W1-4L W20-1 <br /> (MIN 50'MAX 100') <br /> WITH WORK <br /> WORK AREA WORK <br /> AHEAD <br /> TRUCK <br /> DOWNSTREAM TAPER WITH BUFFER SPACE <br /> (SEE TABLE A) FLASHING (SEE TABLE A) TAPER LENGTH SEE SEE <br /> 1BEACON (SEE TABLE A) I NOTE 1 I NOTE 1 <br /> -1 <br /> w �Oi�i i o, im IL.- IIF IF <br /> :57/3 <br /> 4ppp <br /> -_ " <br /> — <br /> 4 SEE 4 SEE TAPER LENGTH <br /> NOTE 1 I NOTE 1 (SEE TABLE A) <br /> ROAD ROAD NOTES LEGEND <br /> WORK NARROWS 1. DISTANCE BETWEEN SIGNS SHALL BE 100'FOR <br /> AHEAD RESIDENTIAL STREET(25 MPH)AND 350'FOR ARTERIAL CONE OR CHANNELIZING DEVICE SEE STANDARD <br /> DRAWING 713. <br /> ROADWAYS. <br /> W20-1 W5-1 2. FLASHING BEACON INSTALLED AT EACH SIGN FOR <br /> R <br /> NIGHT-TIME USE(OPTIONAL). <br /> 3 3. DISTANCES MAY VARY AS APPROVED BY THE ENGINEER. <br /> ' TABLE A 4. SPOTTERS REQUIRED TO CONTROL TRAFFIC WHENEVER <br /> g THE CONTRACTOR MUST INTERRUPT TRAFFIC FLOW TO <br /> SPEED TAPER LENGTH CONE SPACING BUFFER ACCESS THE WORK SITE WITH MATERIALS OR EQUIPMENT <br /> n (MPH) FOR SHIFT WIDTH (FT) SPACING (FLAGGING REQUIRES 3 OR 4 SIGN SETUP). <br /> 5' 6' TANGENT TAPER (Fr) 5. FOR ALTERNATE LANE SHIFT WIDTH REFER TO"MANUAL <br /> 25 26' 31' 25 55 ON UNIFORM TRAFFIC CONTROL DEVICES"(MUTCD) CITY OF EVERETT <br /> 30 38' 45' 30 85 TABLE 6C-2 PAGE 6C-10. <br /> PUBLIC WORKS DEPARTMENT <br /> 35 51' 61' 35 20 120 6. SIGN SIZE PER MUTCD. <br /> 0 40 67' 80' 40 170 ''''“VA;SASS ICOAMITIT I ATMILHELM I'''IS" 01/05/2017 <br /> 7. THIS PLAN IS PROVIDED AS A GUIDE ONLY.FOR SPECIFIC TRAFFIC CONTROL PLAN <br /> go 45 113' 135' 45 220 INFORMATION ON THE TRAFFIC CONTROL PLANS SEE " 702 <br /> 1.4 <br /> CURRENT MUTCD. 2 LANE <br /> RTIAL ROADWAY: <br /> LANE CLOSURE <br /> I r <br />
The URL can be used to link to this page
Your browser does not support the video tag.