My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N — — NM UN MI M — MS c — an NM ICI IN I — all all <br /> I I <br /> NOTES <br /> 1. REFERENCES SEE STANDARD DRAWING 722 <br /> TYPE 2W <br /> (WHITE,ONE SIDE,ARTERIAL STREETS ONLY) 2. MATERIAL THICKNESS SHALL BE PER STANDARD <br /> SPECIFICATIONS 8-22. <br /> N e. 3. UNLESS CALLED FOR IN THE PLANS,RAISED <br /> PAVEMENT MARKERS SHALL ONLY BE <br /> 10' 10' INSTALLED ON ARTERIAL STREETS. <br /> [, STRIPE 30'GAP STRIPE <br /> 40' <br /> LANE WIDTH <br /> MEASUREMENT POINT <br /> LANE LINE (WHITE) <br /> TYPE 2YY <br /> (YELLOW,BOTH SIDES,ARTERIAL STREETS ONLY) VEHICLE LANE WIDTH <br /> MEASUREMENT POINT WHEN <br /> USED AS BICYCLE STRIPE '" <br /> Cr4 <br /> r I <br /> ni I 1 — <br /> I 10 I 10' I LANE WIDTH MEASUREMENT <br /> F <br /> STRIPE 30'GAP STRIPE I POINT WHEN USED AS GORE OR <br /> 40' ���111 EDGE LINE <br /> LANE WIDTH <br /> MEASUREMENT POINT GORE,X=8"; EDGE,W=4"; BICYCLE,W=8" <br /> TWO WAY LEFT TURN LANE LINE (YELLOW) WIDE, EDGE AND BICYCLE LINE (WHITE) <br /> TYPE 2YY <br /> (YELLOW,BOTH SIDES,ARTERIAL STREETS ONLY) <br /> I I N <br /> 0 10' 10' <br /> STRIPE 30'GAP STRIPE it <br /> TYPE 2YY <br /> 40' <br /> (YELLOW,BOTH SIDES,ARTERIAL STREETS ONLY) <br /> Y. SKIP CENTER LINE (YELLOW) <br /> LANE WIDTH <br /> I v I I MEASUREMENT POINT <br /> 'v ( III ) I — I v <br /> CITY OF EVERETT <br /> e 40 LANE WIDTH <br /> LI <br /> MEASUREMENT POINT u PUBLIC WORKS DEPARTMENT <br /> og DOUBLE YELLOW CENTER LINE 'WAN 5A55 IT I" LU WLHELM I"SH <br /> 12/30/2016 <br /> 4' ROADWAY STRIPING DETAILS 720 <br /> I I - <br />
The URL can be used to link to this page
Your browser does not support the video tag.