My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 1 <br /> TRANSIT STOP SIGN(MUTCD R7-107A)AND POST <br /> SIDEWALK <br /> PAINT TOP AND <br /> FACE OF CURB YELLOW TYP RED TYP <br /> 66. <br /> 5' <br /> TYP <br /> 60'TYP <br /> PLAN <br /> 9'TYP <br /> 4"EDGE LINE(WHITE) 8"WIDE LINE(WHITE) <br /> 3 <br /> 2 <br /> BIKE LANE <br /> 1 ;3P <br /> f <br /> o' <br /> l' <br /> P WSDOT STD PLAN M-9,60-00 <br /> 0 <br /> =d CITY OF EVERETT <br /> N PAINTED CURB PUBLIC WORKS DEPARTMENT <br /> a0 BUS PULL OUT SASS Itswey-Flar IcznILHELM Ie""ESH 03/06/2017 <br /> w suwowx�w <br /> ill TRANSIT STOP STRIPING 723 <br /> 1 1 <br /> NM MB — i at NM — — — 1111 In UN M 11111 11111 EN — 11111 — <br />
The URL can be used to link to this page
Your browser does not support the video tag.