My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
— ■I — I NW MI r MN — MI N — En 1 M — r MN MEI <br /> I , <br /> NOTES <br /> 1. STOP LINE AS REQUIRED BY ENGINEER,SEE <br /> CONSTRUCTION PLANS. <br /> 2. PAVEMENT MARKINGS(SYMBOLS,ETC)PER <br /> WSDOT/APWA STANDARD PLAN M24.40-02. <br /> 3. SIZE OF LEGENDS SUCH AS"ONLY","SCHOOL", <br /> "STOP",ETC SHALL BE PER THE CURRENT MUTCD 3B, <br /> 7C.ONLY TO BE USED SPECIFICALLY FOR DROP LANES. <br /> O 0 <br /> / _ 4. INTERMEDIATE PAVEMENT MARKINGS AND LEGENDS <br /> it4k <br /> f/ 30' AS REQUIRED BY ENGINEER SEE PLANS. <br /> 0 <br /> © 5. 8"WHITE WIDE LINE,LENGTH PER CONSTRUCTION <br /> PLAN. <br /> O 6. DOUBLE YELLOW CENTER STRIPE. <br /> 7. TWO WAY LEFT TURN STRIPE. <br /> 8. 4"WHITE PARKING STRIPE. <br /> Z REFERENCES <br /> O© A. WSDOT STANDARD SPECIFICATIONS SECTIONS 8-22, <br /> o' 9-34 AND AMENDMENTS. <br /> 24' B. MUTCD PART 2,3 AND 9C. <br /> [-* <br /> 0 C. WSDOT/APWA STANDARD PLANS SECTION"M" <br /> ROADWAY DELINEATION. <br /> P. <br /> CITY OF EVERETT <br /> PUBLIC WORKS DEPARTMENT <br /> oa uu..s.�., pp _ <br /> x� RYAN SASS I COPEY T I PAUL WILHELM 12/30/2016 <br /> W T yr.uun Wvwow <br /> TURN POCKET DETAIL 722 <br />
The URL can be used to link to this page
Your browser does not support the video tag.