Laserfiche WebLink
I <br /> i <br /> 1 EN PUBLIC WORKS' <br /> 11 <br /> EVERETT <br /> WASHINGTON <br /> ADDENDUM NO. 1 <br /> ' TO <br /> WATER MAIN REPLACEMENT V <br /> W.O. # UP-3730 <br /> 1 APRIL 14, 2021 <br /> NOTICE TO PLANHOLDERS: <br /> Addendum No. 1 contains the following revisions, additions, deletions and clarifications and is <br /> hereby made a part of the contract documents for the above named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 1 in the space provided on page SP-20 in <br /> Division P, Proposal Form. Failure to comply with this requirement may render the Bid non- <br /> responsive and may cause its rejection. <br /> This Addendum consists of 36 pages, including all revisions, attachments and details. <br /> The Bid date, time and location for receipt of Bids are unchanged by this Addendum. <br /> THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> SPECIAL PROVISIONS - <br /> IReplace pages SP-174 to SP-184 and SP-199 to SP-207, per the attached. The following <br /> items have been revised: <br /> Page SP-174 to SP-175, Division 7, section 7-09.3(21); revised as follows: <br /> 7-09.3(21) Thrust Blocking <br /> Revise the first sentence of the first paragraph to read as follows: <br /> Place concrete thrust blocking, as noted on the Plans and described in these <br /> Special Provisions, at bends where new ductile iron pipe connects to existing cast <br /> iron pipe. <br /> Supplement 7-09.3(21) by adding the following: <br /> Provide mechanical joint restraining on all fittings connecting ductile iron <br /> 1 pipe to ductile iron pipe. Provide mechanical joint restraint for a length on <br /> each side of the fitting, in accordance with Table 5A(shown below) of the COE <br /> Design and Construction Standards and Specifications. <br /> 1 <br /> Addendum 1 Page 1 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax(425) 257-8882 <br />