My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> i <br /> 1 EN PUBLIC WORKS' <br /> 11 <br /> EVERETT <br /> WASHINGTON <br /> ADDENDUM NO. 1 <br /> ' TO <br /> WATER MAIN REPLACEMENT V <br /> W.O. # UP-3730 <br /> 1 APRIL 14, 2021 <br /> NOTICE TO PLANHOLDERS: <br /> Addendum No. 1 contains the following revisions, additions, deletions and clarifications and is <br /> hereby made a part of the contract documents for the above named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 1 in the space provided on page SP-20 in <br /> Division P, Proposal Form. Failure to comply with this requirement may render the Bid non- <br /> responsive and may cause its rejection. <br /> This Addendum consists of 36 pages, including all revisions, attachments and details. <br /> The Bid date, time and location for receipt of Bids are unchanged by this Addendum. <br /> THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> SPECIAL PROVISIONS - <br /> IReplace pages SP-174 to SP-184 and SP-199 to SP-207, per the attached. The following <br /> items have been revised: <br /> Page SP-174 to SP-175, Division 7, section 7-09.3(21); revised as follows: <br /> 7-09.3(21) Thrust Blocking <br /> Revise the first sentence of the first paragraph to read as follows: <br /> Place concrete thrust blocking, as noted on the Plans and described in these <br /> Special Provisions, at bends where new ductile iron pipe connects to existing cast <br /> iron pipe. <br /> Supplement 7-09.3(21) by adding the following: <br /> Provide mechanical joint restraining on all fittings connecting ductile iron <br /> 1 pipe to ductile iron pipe. Provide mechanical joint restraint for a length on <br /> each side of the fitting, in accordance with Table 5A(shown below) of the COE <br /> Design and Construction Standards and Specifications. <br /> 1 <br /> Addendum 1 Page 1 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax(425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.