My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Table 5A I <br /> Horizontal Thrust Restraint Length <br /> Fitting Pipe Diameter <br /> 6" 8" 12„ <br /> Length to be Restrained in Each <br /> Direction <br /> 11-1/4° bend 5' 5' 10' <br /> 22-1/2°bend 10' 10' 15' <br /> 45° bend 15' 20' 25' <br /> 90° bend* 35' 45' 60' <br /> Tees (where all legs can be 20' 25' 55' <br /> restrained)* <br /> Dead Ends and Tees (where 60' 80' 115' 1 <br /> only one branch is installed)* <br /> * 90° bends, tees, bends connecting to cast iron pipe, and dead ends <br /> must use thrust blocks in addition to this table. <br /> Provide concrete thrust blocking at all tees, offsets, valves, dead ends, plugs 111 <br /> and crosses, and where shown on the plans, including City installed fittings, <br /> pipe and valves. Provide cast-in-place concrete thrust blocking having a <br /> minimum of 1/4-square foot bearing against the fitting, and be clear of joints <br /> so as to permit taking up or dismantling joint, with bearing area against <br /> undisturbed soil, and sized and installed in accordance with WSDOT <br /> standard plan B-90.40-01. Provide a minimum measurement of 12-inches <br /> between the pipe and the undisturbed bank for all poured in place concrete thrust <br /> blocking. Form concrete blocking and pour using commercial concrete. Place <br /> blocking between solid ground and the fitting to be anchored with the area bearing <br /> on the pipe and on the ground in each instance being as Shown or directed by the <br /> Engineer. Place the blocking, unless otherwise shown or directed, so that the pipe <br /> and fitting joints, including nuts and bolts, can be accessible for repair. <br /> Page SP-204, Division 9; Section 9-30.2(6); revise to: <br /> 9-30.2(6) Restrained Joints <br /> Supplement 9-30.2(6) by adding the following: <br /> For ductile iron pipe provide "MegaLug®Series 1100" mechanical restrained <br /> joints as manufactured by EBAA Iron, or City approved equal. <br /> Addendum 1 Page 2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.