Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> bedding and backfill materials; and plastic film wrap required for the complete installation of <br /> the hydrant as specified. <br /> Bid Item 27 - Salvage Existing Fire Hydrant <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit contract price for Relocate Existing Fire Hydrant shall constitute full compensation <br /> for all labor, materials, tools and equipment necessary for salvaging the existing hydrant, <br /> and providing assembly in accordance with COE Std Drawing No. 512 or as modified and <br /> supplemented herein, in the location shown on the Plans, including but not limited to, all <br /> gaskets, bolts, pipe, nipples, adapters, couplings, fittings, restraint systems, vertical bends, <br /> all other necessary appurtenances, temporary thrust blocking, trench excavation, sheeting <br /> and shoring and dewatering, backfill and compaction of native material, maintenance, <br /> restoration and relocation, if required, of culverts, storm drainage pipe, other utilities and <br /> structures, pressure and purity testing, including temporary blow-offs necessary for testing, <br /> extra depth excavation, backfill and compaction required to clear buried utilities or other <br /> obstructions and cutting, and removal and disposal of existing pipe. <br /> Bid Item 28 - Remove Existing Fire Hydrant <br /> Measurement and Payment: Unit Price per Each (EA) ' <br /> The unit contract price for Relocate Existing Fire Hydrant shall constitute full compensation <br /> for all labor, materials, tools and equipment necessary for salvaging the existing hydrant, <br /> and providing assembly in accordance with COE Std Drawing No. 512 or as modified and <br /> supplemented herein, in the location shown on the Plans, including but not limited to, all <br /> gaskets, bolts, pipe, nipples, adapters, couplings, fittings, restraint systems, vertical bends, <br /> all other necessary appurtenances, temporary thrust blocking, trench excavation, sheeting <br /> and shoring and dewatering, backfill and compaction of native material, maintenance, <br /> restoration and relocation, if required, of culverts, storm drainage pipe, other utilities and <br /> structures, pressure and purity testing, including temporary blow-offs necessary for testing, <br /> extra depth excavation, backfill and compaction required to clear buried utilities or other <br /> obstructions and cutting, and removal and disposal of existing pipe. <br /> Bid Item 29 - Air Vacuum Valve Assembly, 2-Inch <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit contract price for Air Vacuum Valve Assembly, -Inch shall constitute full <br /> compensation for all labor, materials, tools and equipment necessary and incidental to <br /> furnish and install valve assembly complete in place, including but not limited to, <br /> dewatering; removal and disposal of existing curb and gutter, and sidewalk; excavation, <br /> removal, hauling, and disposal of excavated materials; furnishing, jointing, and installing <br /> valves and valve boxes, vaults; piping and tubing, connecting to the new main, installing <br /> concrete thrust blocks; restraint systems; painting; flushing and disinfecting; furnishing, <br /> installing, compacting, and testing, bedding and backfill materials; constructing asphalt <br /> concrete pad around valve assembly if necessary; cleanup; and any additional work, I <br /> materials, and equipment required to install the valves and assembly, except as included in <br /> other unit price bids. <br /> Bid Item 30 - Assist COE in Connecting to Existing Watermain I <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit contract price to Assist COE in Connecting to Existing Watermain shall constitute <br /> full compensation for all labor, materials, tools and equipment necessary for connection to <br /> existing system, in accordance with 7-09.3(19)A including, yet not limited to; all costs for <br /> traffic control, excavation, shoring, dewatering, haul and disposal of excavated materials, <br /> Water Main Replacement"V" Division B—BID DESCRIPTIONS April 2021 <br /> WO No.—UP3730 SP-10 <br /> i <br />