Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I furnishing, installingand compacting beddingand backfill materials; <br /> p g labor and equipment <br /> required for the complete installation of the connection as specified. <br /> I <br /> Unit contract price shall include all coordination efforts with the City and assistance as City <br /> forces make the actual connection. Connection of a water service line to the watermain <br /> and connection of new water service line to existing water service line will not be <br /> Iconsidered a connection to the existing system. <br /> Bid Item 31 - Corporation Stop w/ Service Saddle, 1-inch <br /> I <br /> Measurement and Payment: Unit Price per Each (EA). <br /> The unit contract price for Corporation Stop w/Service Saddle, -Inch shall constitute full <br /> compensation for all labor, materials, tools and equipment necessary for installation of a <br /> I <br /> new corporation stop and service saddle in accordance with Parts A and B of Detail 1/D1 of <br /> the Plans, including yet not limited to, furnishing and installing the service saddle and <br /> corporation stop; trench excavation and dewatering, pavement removal, backfill and <br /> compaction; and testing the connection. <br /> IBid Item 32 - Service Saddle and Valve Assembly, 2-inch <br /> Measurement and Payment: Unit Price per Each (EA) <br /> I <br /> The unit contract price for Service Saddle and Valve Assembly, 2-Inch, shall constitute full <br /> compensation for all labor, materials, tools, and equipment necessary for providing <br /> assembly in accordance with Parts A, B, C, and L of COE Standard Drawing No. 502 <br /> I including yet not limited to, furnishing and installing the service saddle, brass nipple, gate <br /> valve, valve box; trench excavation and dewatering, pavement removal, backfill and <br /> compaction; and testing the connection. <br /> I <br /> Note: This unit price will also apply to furnishing and installing blind flange, 2-inch NST tap <br /> and connecting to the 2-inch HDPE pipe shown on Detail 5, Drawing D1. <br /> Bid Item 33 - Water Service, 1-inch <br /> IBid Item 34 - Water Service, 2-inch <br /> Measurement and Payment: Unit Price per Lineal Foot (LF). <br /> ' The unit contract price for Water Service -inch, shall constitute full compensation for all <br /> labor, materials, tools and equipment necessary for new service lines continuous and <br /> unspliced from the new main to a new meter setter in accordance with Parts C-G of COE <br /> I <br /> Standard Drawing No. 501, or Parts D-G of COE Standard Drawing No. 502, including yet <br /> not limited to, connecting to service connection saddle, street pavement, concrete curb, <br /> concrete curb and gutter, concrete driveway, and concrete sidewalk removal, unless <br /> installed using approved boring methods; furnishing, installing, and testing to curb stop, <br /> I <br /> valves, fittings, and installation of service line, and appurtenances; providing a #10 copper <br /> tracer wire for polyethylene pipe, compaction, connection to existing or new meter setter <br /> including fittings; dewatering; testing; removal or abandonment of existing service <br /> I <br /> connection. <br /> Bid Item 35 - Connect to Fire Service, 4-inch <br /> I <br /> Bid Item 36 - Connect to Fire Service, 6-inch <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit contract price for Connect to Water Service, =Inch, shall constitute full <br /> ' compensation for all labor, materials, tools and equipment necessary to connect new = <br /> inch ductile iron service lines from the tee on the new main to reconnecting with the existing <br /> service line, including yet not limited to, tee, reducers; pipe installation; restrained joint <br /> I <br /> Water Main Replacement"V" Division B—BID DESCRIPTIONS April 2021 <br /> WO No.—UP3730 SP-11 <br /> I <br />