I
<br /> CITY OF EVERETT SPECIAL PROVISIONS
<br /> I furnishing, installingand compacting beddingand backfill materials;
<br /> p g labor and equipment
<br /> required for the complete installation of the connection as specified.
<br /> I
<br /> Unit contract price shall include all coordination efforts with the City and assistance as City
<br /> forces make the actual connection. Connection of a water service line to the watermain
<br /> and connection of new water service line to existing water service line will not be
<br /> Iconsidered a connection to the existing system.
<br /> Bid Item 31 - Corporation Stop w/ Service Saddle, 1-inch
<br /> I
<br /> Measurement and Payment: Unit Price per Each (EA).
<br /> The unit contract price for Corporation Stop w/Service Saddle, -Inch shall constitute full
<br /> compensation for all labor, materials, tools and equipment necessary for installation of a
<br /> I
<br /> new corporation stop and service saddle in accordance with Parts A and B of Detail 1/D1 of
<br /> the Plans, including yet not limited to, furnishing and installing the service saddle and
<br /> corporation stop; trench excavation and dewatering, pavement removal, backfill and
<br /> compaction; and testing the connection.
<br /> IBid Item 32 - Service Saddle and Valve Assembly, 2-inch
<br /> Measurement and Payment: Unit Price per Each (EA)
<br /> I
<br /> The unit contract price for Service Saddle and Valve Assembly, 2-Inch, shall constitute full
<br /> compensation for all labor, materials, tools, and equipment necessary for providing
<br /> assembly in accordance with Parts A, B, C, and L of COE Standard Drawing No. 502
<br /> I including yet not limited to, furnishing and installing the service saddle, brass nipple, gate
<br /> valve, valve box; trench excavation and dewatering, pavement removal, backfill and
<br /> compaction; and testing the connection.
<br /> I
<br /> Note: This unit price will also apply to furnishing and installing blind flange, 2-inch NST tap
<br /> and connecting to the 2-inch HDPE pipe shown on Detail 5, Drawing D1.
<br /> Bid Item 33 - Water Service, 1-inch
<br /> IBid Item 34 - Water Service, 2-inch
<br /> Measurement and Payment: Unit Price per Lineal Foot (LF).
<br /> ' The unit contract price for Water Service -inch, shall constitute full compensation for all
<br /> labor, materials, tools and equipment necessary for new service lines continuous and
<br /> unspliced from the new main to a new meter setter in accordance with Parts C-G of COE
<br /> I
<br /> Standard Drawing No. 501, or Parts D-G of COE Standard Drawing No. 502, including yet
<br /> not limited to, connecting to service connection saddle, street pavement, concrete curb,
<br /> concrete curb and gutter, concrete driveway, and concrete sidewalk removal, unless
<br /> installed using approved boring methods; furnishing, installing, and testing to curb stop,
<br /> I
<br /> valves, fittings, and installation of service line, and appurtenances; providing a #10 copper
<br /> tracer wire for polyethylene pipe, compaction, connection to existing or new meter setter
<br /> including fittings; dewatering; testing; removal or abandonment of existing service
<br /> I
<br /> connection.
<br /> Bid Item 35 - Connect to Fire Service, 4-inch
<br /> I
<br /> Bid Item 36 - Connect to Fire Service, 6-inch
<br /> Measurement and Payment: Unit Price per Each (EA)
<br /> The unit contract price for Connect to Water Service, =Inch, shall constitute full
<br /> ' compensation for all labor, materials, tools and equipment necessary to connect new =
<br /> inch ductile iron service lines from the tee on the new main to reconnecting with the existing
<br /> service line, including yet not limited to, tee, reducers; pipe installation; restrained joint
<br /> I
<br /> Water Main Replacement"V" Division B—BID DESCRIPTIONS April 2021
<br /> WO No.—UP3730 SP-11
<br /> I
<br />
|