My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Payment for the lumpitemon <br /> e-time sum Temporary Roadway Patch shall be a one time lump sum <br /> regardless of how many times Temporary Roadway Patch is placed, removed, replaced, or <br /> ' relocated.The lump sum price shall be full compensation for all labor, material, tools and <br /> equipmentnecessary to satisfactorily complete the Work as defined in the Standard <br /> Specifications, 5-06.3(6) of these Special Provisions and as shown on the Plans. <br /> Bid Item 41 - Crushed Surfacing Top Course <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for crushed surfacing top course will be by the ton as recorded on certified <br /> weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to <br /> dimensions defined in the Work, descriptions for other bid items, shown on the Plans, <br /> ' details or COE Standard Drawings or as otherwise approved by the Engineer. Crushed <br /> Surfacing Top Course material placed exceeding "neatline" quantities without advance <br /> authorization by the Inspector will not be paid for. <br /> The unit price per ton shall be full compensation for all labor, compaction, material, tools, <br /> and equipment necessary to furnish, haul, stockpile, place, grade, and compact imported <br /> crushed surfacing top course for the Work as required, from a Contractor supplied source in <br /> accordance with the Standard Specifications and these Special Provisions. <br /> The unit price for crushed surfacing top course also includes all costs for controlling <br /> moisture content. <br /> Also included in this bid item shall be the cost of all equipment required to remove existing <br /> soils to attain proper elevations, compaction of native subgrade soils, as well as to <br /> uniformly spread and compact the crushed surfacing material. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> displaced unsuitable material, including haul. <br /> Include in this bid item the cost of sprinkling during dry periods prior to placement of the <br /> crushed surfacing and while spreading and compacting the material. <br /> ' Payment for crushed surfacing top course will be by the ton of material placed and <br /> approved by the Inspector. <br /> ' Bid Item 42 - Planing Bituminous Pavement (2" deep) <br /> Measurement and Payment: Unit Price per Square Yard <br /> Measurement for Planing Bituminous Pavement (2" deep) shall be per square yard. <br /> The unit price per square yard for Planing Bituminous Pavement (2" deep) shall be full <br /> compensation for all costs incurred to perform the work described in Section 5-04.3(14). <br /> Bid Item 43 - HMA, CL 1/2" PG 64-22 for Permanent Trench Patch <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for HMA, CL 1/2" PG 64-22 shall be by the ton, recorded on certified weight <br /> ' tickets in accordance with 1-09.2 WEIGHING EQUIPMENT for HMA placed within the limits <br /> of dimensions defined in the Work or shown on the Plans, Standard Specifications, Section <br /> 5-06 of these Special Provisions, or as otherwise approved by the Engineer. The <br /> measurement and payment limits for measuring the width of this bid item shall not exceed <br /> the saw-cut limits shown on the Drawings. No deduction will be made for the weight of <br /> asphalt binder, blending sand, mineral filler, or other component of the mixture. <br /> The unit price for this bid item shall include all labor, materials, equipment and related work <br /> necessary to furnish, machine-place, compact, roll and perform density tests on multiple <br /> lifts of HMA — CL 1/2" PG 64-22 pavement including streets, alleys, street crossings, and <br /> driveway aprons as shown on the Plans. <br /> Water Main Replacement"V" Division B—BID DESCRIPTIONS April 2021 <br /> WO No.—UP3730 SP-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.