Laserfiche WebLink
I <br /> IProject: Saratoga Heights Navy Housing <br /> Location: Whidbey Island, WA <br /> I Owner: NAVFAC General Contractor: Washington Patriot <br /> Address: 1115 W Lexington Rd, Bldg 103 Address: PO Box 2031 <br /> Oak Harbor,WA 98278 Gig Harbor, WA 98335 <br /> I <br /> Contract Amount: $1,470,000.00 Phone: (253) 853-2304 Fax(253) 853-5921 <br /> Award Date: 3/2011 <br /> Description: Provide all labor,materials, supervision and equipment to install all water and gas line, <br /> I installed 19,840 If of 1-8"pipe and required service connections. <br /> Completion Date: December 2011 <br /> Project: US2 and Chain Lake Road Intersection Improvements <br /> I Location: Monroe, WA <br /> Owner: City of Monroe Engineer: WH Pacific <br /> Contact: Jammi Guion <br /> I Phone: (360)794-7400 Fax: (360) 794-4007 <br /> Contract Amount: $1,581,432.13 Award Date: 12/17/2009 <br /> Description: Construction of new travel and turn lanes, revisions to existing traffic signal and adding <br /> I additional illumination at the intersection of US2, Chain Lake Road and North Lewis Street along with <br /> profile revisions to several commercial entrances and installing new ADA ramps and sidewalks. Work also <br /> consists of: pavement removal, grading, drainage, surfacing, paving with HMA;cement concrete curb, <br /> I gutter and sidewalk; pavement marking; permanent signing; retaining walls,planting, irrigation and other <br /> work. <br /> Completion Date: July 28,2011 Contract Allowed Days: 140 working days <br /> IProject: 20th St SE and SR 9 Roadway Improvements <br /> Location: Lake Stevens, WA <br /> Owner: Snohomish County Engineer: Snohomish County <br /> I <br /> Contact: Charlie Green <br /> Phone: (425)388-6662 Fax: (425) 388-6670 <br /> Contract Amount: $22,369,309.41 Award Date: 6/25/08 <br /> I Description: Improvement of 20th Street SE between 91st Avenue SE and South Lake Stevens Road and SR <br /> 9 from Lake Stevens Road to approximately 3,000 feet north of 20th Street SE. Work includes road <br /> reconstruction and widening, storm drainage improvements, sewer lines, installed 32,534 If of 6-36"pipe, <br /> I retaining walls, signalization, pond landscaping,bridge replacement,detention ponds, construction of a fire- <br /> lane roadway, and other work. <br /> Completion Date: August 22, 2011 Contract Allowed Days: 440 working days <br /> IProject: Broadway at Beverly Blvd Intersection Improvements <br /> Location: Everett, WA <br /> I Owner: City of Everett Engineer: City of Everett,Ryan L Sass <br /> Contact: Tom Fuchs <br /> Phone: (425)257-8800 Fax: (425)257-8929 <br /> Contract Amount: $1,242,434.50 Award Date: 12/13/07 Start Date: 5/18/09 <br /> I <br /> Description: Work consisted of an intersection realignment combined with an additional North bound lane <br /> on Broadway and new traffic signals. The work performed on this project consisted of the construction of <br /> CMU block walls, new storm lines and structures, new sidewalks,handicapped wheel chair ramps in <br /> I existing walkways, grade changes to the existing intersection, new asphalt, planing and asphalt overlays, <br /> landscaping and irrigation. During this project there was a design conflict with the existing water main and <br /> the City of Everett had Thomco install 360' of new 8"ductile iron pipe in order to resolve the design issue. <br /> ICompletion Date: 12/2009 Contract Allowed Days: 100 Working Days <br /> I 6 <br />