<br /> IProject: Saratoga Heights Navy Housing
<br /> Location: Whidbey Island, WA
<br /> I Owner: NAVFAC General Contractor: Washington Patriot
<br /> Address: 1115 W Lexington Rd, Bldg 103 Address: PO Box 2031
<br /> Oak Harbor,WA 98278 Gig Harbor, WA 98335
<br /> I
<br /> Contract Amount: $1,470,000.00 Phone: (253) 853-2304 Fax(253) 853-5921
<br /> Award Date: 3/2011
<br /> Description: Provide all labor,materials, supervision and equipment to install all water and gas line,
<br /> I installed 19,840 If of 1-8"pipe and required service connections.
<br /> Completion Date: December 2011
<br /> Project: US2 and Chain Lake Road Intersection Improvements
<br /> I Location: Monroe, WA
<br /> Owner: City of Monroe Engineer: WH Pacific
<br /> Contact: Jammi Guion
<br /> I Phone: (360)794-7400 Fax: (360) 794-4007
<br /> Contract Amount: $1,581,432.13 Award Date: 12/17/2009
<br /> Description: Construction of new travel and turn lanes, revisions to existing traffic signal and adding
<br /> I additional illumination at the intersection of US2, Chain Lake Road and North Lewis Street along with
<br /> profile revisions to several commercial entrances and installing new ADA ramps and sidewalks. Work also
<br /> consists of: pavement removal, grading, drainage, surfacing, paving with HMA;cement concrete curb,
<br /> I gutter and sidewalk; pavement marking; permanent signing; retaining walls,planting, irrigation and other
<br /> work.
<br /> Completion Date: July 28,2011 Contract Allowed Days: 140 working days
<br /> IProject: 20th St SE and SR 9 Roadway Improvements
<br /> Location: Lake Stevens, WA
<br /> Owner: Snohomish County Engineer: Snohomish County
<br /> I
<br /> Contact: Charlie Green
<br /> Phone: (425)388-6662 Fax: (425) 388-6670
<br /> Contract Amount: $22,369,309.41 Award Date: 6/25/08
<br /> I Description: Improvement of 20th Street SE between 91st Avenue SE and South Lake Stevens Road and SR
<br /> 9 from Lake Stevens Road to approximately 3,000 feet north of 20th Street SE. Work includes road
<br /> reconstruction and widening, storm drainage improvements, sewer lines, installed 32,534 If of 6-36"pipe,
<br /> I retaining walls, signalization, pond landscaping,bridge replacement,detention ponds, construction of a fire-
<br /> lane roadway, and other work.
<br /> Completion Date: August 22, 2011 Contract Allowed Days: 440 working days
<br /> IProject: Broadway at Beverly Blvd Intersection Improvements
<br /> Location: Everett, WA
<br /> I Owner: City of Everett Engineer: City of Everett,Ryan L Sass
<br /> Contact: Tom Fuchs
<br /> Phone: (425)257-8800 Fax: (425)257-8929
<br /> Contract Amount: $1,242,434.50 Award Date: 12/13/07 Start Date: 5/18/09
<br /> I
<br /> Description: Work consisted of an intersection realignment combined with an additional North bound lane
<br /> on Broadway and new traffic signals. The work performed on this project consisted of the construction of
<br /> CMU block walls, new storm lines and structures, new sidewalks,handicapped wheel chair ramps in
<br /> I existing walkways, grade changes to the existing intersection, new asphalt, planing and asphalt overlays,
<br /> landscaping and irrigation. During this project there was a design conflict with the existing water main and
<br /> the City of Everett had Thomco install 360' of new 8"ductile iron pipe in order to resolve the design issue.
<br /> ICompletion Date: 12/2009 Contract Allowed Days: 100 Working Days