I <br /> Project: US2/North Kelsey Street Intersection Improvement Project <br /> Location: Monroe, WA <br /> Owner: City of Monroe Engineer: W&H Pacific I <br /> Contact: Jammi Guion <br /> Phone: (360) 794-7400 Fax: (360) 794-4007 <br /> Contract Amount: $1,314,447.60 Award Date: 8/13/07 I <br /> Description: Construction of intersection improvements that widen US2 for an additional northbound left <br /> turn lane. Items of work include asphalt removal, excavation for intersection widening, drainage,wet vault <br /> installation, dewatering, surfacing, placement of HMA, removing existing curb and replacing with new I <br /> cement concrete curb, gutter and sidewalk,pavement markings, sign relocations, signal modifications and <br /> other work. <br /> Completion Date: December 10,2008 Contract Allowed Days: <br /> Project: SR202/ 127th Place Interim Signal Project <br /> Location: Woodinville, WA I <br /> Owner: City of Woodinville Engineer: City of Woodinville <br /> Contact: <br /> Phone: (425)489-2700 Fax: (425)489-2705 I <br /> Contract Amount: $1,165,880.00 Award Date: 6/2007 <br /> Description: Construction of a new span wire traffic signal at the intersection of SR 202 and 127th Place. <br /> The project includes grading; drainage; surfacing; paving with asphalt concrete pavement; cement concrete I <br /> curb, gutter, and sidewalk; pavement marking; permanent signing; and other work. <br /> Completion Date: 6/2008 <br /> Project: Ash Way Roundabout I <br /> Location: Lynnwood, WA <br /> Owner: Snohomish County Engineer: Snohomish County <br /> Contact: Charlie Green I <br /> Phone: (425) 388-6662 Fax: (425)388-6670 <br /> Contract Amount: $1,367,844.60 Award Date: 6/6/07 <br /> Description: Construction of a single lane roundabout at the intersection of Ash Way and 18t Avenue <br /> West. Work includes clearing, grading, drainage, storm drainage, stormwater treatment facilities, curb, <br /> gutter,cement concrete sidewalks(porous), paving, landscaping,temporary irrigation, and other work. <br /> Substantial Completion Date: January 3, 2008 Contract Allowed Days: 80 working days I <br /> Project: SR524 Royal Anne Road to SR527 Phase IA <br /> Location: Bothell, WA I <br /> Owner: City of Bothell Engineer: DMJM Harris <br /> Contact: Eddie Lowe <br /> Phone: (425) 806-6811 Fax: (425)486-2489 I <br /> Contract Amount: $9,013,970.00 Award Date: 6/29/2006 <br /> Description: This Project includes the reconstruction of approximately 4,000 liner feet of existing roadway; <br /> including widening the existing roadway to five lanes with bicycle lanes and sidewalks. Additional features <br /> include the reconstruction of the 9th Avenue SE/Filbert Road traffic signal, a fish passage culvert on Filbert I <br /> Creek,a new bridge spanning North Creek, street lighting, sound walls,water, sewer and storm drainage, <br /> installing approximately 14,855 If of 12-48"pipe. <br /> Completion Date: June 20,2008 Contract Allowed Days: 320 working days I <br /> I <br /> 7 I <br />