My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/06/30 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/06/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:31:31 PM
Creation date
7/2/2021 2:58:48 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/30/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 06CC5756-85D6-4B22-92FD-F6421337EFD7 <br />Bus Bay Assignments <br />Sound Transit is assigned the use of the bus bays specified in Exhibit E. Except <br />for emergencies, any change or revision by the City to bay assignments must be <br />coordinated with routine service changes and may not be made without Sound <br />Transits written consent which will not be unreasonably withheld, and any <br />change must be agreed upon 90 days prior to the forthcoming service <br />change. Exhibit E will be updated as changes occur by the Designated <br />Representatives. <br />3.1.10 Signage Hardware <br />The City will provide post -mounted schedule holders to Sound Transit to be <br />installed on the bus platforms assigned to Sound Transit. The City will coordinate <br />the update of service change information and the required replacement of the <br />schedule holders with the other bus bay users as frequently as provided in Exhibit <br />C. <br />3.1.11 Changeable Information <br />The City will install all Sound Transit changeable information. In addition, the City <br />will install the Everett Station area maps, the Sound Transit system maps, and <br />Sounder schedubs produced and provided by Sound Transit as part of the service <br />change process and as required between service changes due to minor schedule <br />revisions or damaged signage. The City will produce and install Sound Transit bus <br />schedules, bus bay maps, and Everett system maps for each service change. <br />Post -mounted schedule holders must be supplied by the City for Sound Transit to <br />install. The changeable information in the schedule holders will be maintained by <br />the City and/or other parties as specified in Exhibit C. <br />The City will notify Sound Transit of any required signage maintenance. <br />3.1.12 Scheduled Maintenance <br />The City will provide scheduled maintenance as described in Exhibit C for the <br />assigned Sound Transit parking stalls excluding Lot C; the bays, platform space, <br />and shelters/windscreens assigned to ST Express buses. <br />ST maintains the Sounder platform from the leading edge of the tactile pavers to <br />the expansion joint (approx. seven feet and six inches) from the platform edge for <br />the length of the Sounder platform. <br />The City of Everett maintains the Sounder platform as well from the five feet line <br />to the platform edge and platform shelters. <br />3.1.13 Unscheduled Maintenance <br />The City will provide unscheduled maintenance and minor repairs as described in <br />Exhibit C for the assigned Sound Transit parking stalls, bus bays, platforms, shelters, <br />and windscreens assigned to ST Express buses and Sounder commuter rail. Any <br />unscheduled maintenance whereupon the cost is unbudgeted and the cost exceeds <br />GA 0127-20 Page 4 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.