Laserfiche WebLink
DocuSign Envelope ID: 06CC5756-85D6-4B22-92FD-F6421337EFD7 <br />the amount of $10,000 must be communicated to Sound Transit prior to work being <br />performed. ST will require a brief scope of the work to be undertaken and a rough <br />order of magnitude. <br />3.1.14 Utilities <br />The City is responsible for connecting and maintaining utilities such as, but not limited <br />to, electrical power, water, storm water and telephone to the extent reasonably <br />necessary for the operation of the all parking areas and the bus/commuter rail <br />platforms. <br />3.2 Roles and Responsibilities of Sound Transit <br />3.2.1 Signage Hardware <br />Sound Transit will supply, install and maintainthefollowing regional signage and <br />reformation display hardware for use at Everett Station as well as on the bus, <br />Sounder, andAmtrak platforms:. <br />a. Regional T beacons; <br />b. Platform Station Identification Signs; <br />c. Route flags; <br />d. Information displays; <br />e. Regulatory signs; <br />f. Information signs; and <br />g. Wayfinding signs. <br />Sound Transit will provide quarterly signage maintenance in coordination with regular <br />service changes. <br />3.2.2 Route Flag Changes <br />Sound Transit will update the route flags on the bus platform at regularly <br />scheduled service changes. Refer to Exhibit C. The City will give Sound Transit <br />90 calendar days' notice for any route flag changes as a result of service <br />changes by Everett Transit. <br />3.2.3 Changeable Information <br />Sound Transit will produce the Everett Station area maps, the Sound Transit <br />system maps and the Sounder schedubs that will be installed by the City in the <br />signage hardware on the bus and rail platforms. Refer to Exhibit C. <br />3.2.4 Security <br />GA 0127-20 Page 5 of 24 <br />