My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/06/30 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/06/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:31:31 PM
Creation date
7/2/2021 2:58:48 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/30/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 4 � Construction Engineering <br />Construction Engineering includes the tasks of addressing contractor questions or field modifications, and <br />the field inspection and monitoring of construction activities. High level tasks are outlined below, but <br />detailed costs are not included at this time The cost of construction engineering is anticipated to be <br />included in the grant funding requests for the construction phase of the project. Construction engineering <br />costs will be updated in a future amendment, and a more detailed scope provided when previous design <br />phases have been completed and more details of the project are known. <br />Task 4-1 — Project Management <br />The tasks, roles and expectations for Task 4-1 are the same as for Task 1-1. The following additional <br />meet is anticipated for Task 4-1: <br />1. Pre -construction conference <br />The scope does not anticipate Transpo Group's participation at weekly construction field meetings. A <br />representative of KBA, Inc. will participate in construction field meetings at the City's request. <br />Task 4-2 -Construction Engineering <br />KBA, Inc. will provide field inspection and construction engineering for the City, in compliance with the <br />requirements for a federally -funded project. Details of KBA, Inc.'s scope will be developed following <br />completion of Phase 1 as more is known about the final form of the project. <br />Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.