Laserfiche WebLink
Phase 4 � Construction Engineering <br />Construction Engineering includes the tasks of addressing contractor questions or field modifications, and <br />the field inspection and monitoring of construction activities. High level tasks are outlined below, but <br />detailed costs are not included at this time The cost of construction engineering is anticipated to be <br />included in the grant funding requests for the construction phase of the project. Construction engineering <br />costs will be updated in a future amendment, and a more detailed scope provided when previous design <br />phases have been completed and more details of the project are known. <br />Task 4-1 — Project Management <br />The tasks, roles and expectations for Task 4-1 are the same as for Task 1-1. The following additional <br />meet is anticipated for Task 4-1: <br />1. Pre -construction conference <br />The scope does not anticipate Transpo Group's participation at weekly construction field meetings. A <br />representative of KBA, Inc. will participate in construction field meetings at the City's request. <br />Task 4-2 -Construction Engineering <br />KBA, Inc. will provide field inspection and construction engineering for the City, in compliance with the <br />requirements for a federally -funded project. Details of KBA, Inc.'s scope will be developed following <br />completion of Phase 1 as more is known about the final form of the project. <br />Page 16 <br />