Laserfiche WebLink
Exhibit D: Prime Consultant Cost Computation Page 6 of 7 <br />transporrniu 1 �r <br />WHAT TRANSPORTATION CAN BE <br />Transpo Cost Rate Range Schedule <br />Pay rates are effective from September 26, 2020 through June 25, 2021, within the ranges shown in the attachment. <br />2,1 <br />Engineer/Planner/Analyst/Principal/Director - Level 7 <br />Min Max <br />$75 $120 <br />Engineer/Planner/Analyst/Assoc Prin/Proj Adm - Level 6 <br />$55 $80 <br />Engineer/Planner/Analyst/Proj Adm - Level 5 <br />Engineer/Planner/Analyst/Proj Adm - Level 4 <br />Engineer/Planner/Analyst/Proj Adm - Level 3 <br />Engineer/Planner/Analyst/Proj Adm - Level 2 <br />Engineer/Planner/Analyst/Proj Adm - Level 1 <br />$50 $70 <br />$40 $60 <br />$30 $50 <br />$25 $45 <br />$15 $35 <br />