My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/06/30 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/06/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:31:31 PM
Creation date
7/2/2021 2:58:48 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/30/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
transpogrolJo) {�r <br />Transpo Billing Rate Schedule <br />Pay rates are effective from September 26, 2020 thrcEiciiiithv qirt4 o hklarttt&izerhim ifthe attachment. <br />Principal L7 <br />Principal L7 <br />Principal L7 <br />Principal L7 <br />Principal L7 <br />P rincipal, Exec Director L7 <br />Director L7 <br />P lanner L7 <br />Director L7 <br />B Haldors <br />M. Swenson, PE, PTOE <br />K. Collins, PE, PTOE <br />D McKinney <br />P. Lynch, AICP <br />J Duesing <br />C. Titze, AICP/PP <br />J. Lewis <br />S Brinkerhoff, CPA <br />Planner L6 <br />Associate Principal L6 <br />Associate Principal L6 <br />Engineer L6 <br />S . Le Vine, AICP, PP <br />S . Herzstein, PE, PTOE <br />R. Peterson, PE, PTOE <br />B Turley, PE <br />Proj Admin L5 <br />Engineer L5 <br />Engineer L5 <br />Engineer L5 <br />Engineer L4 <br />Engineer L4 <br />Analyst L4 <br />P roj Admin L4 <br />Engineer L4 <br />Engineer L4 <br />Engineer L4 <br />Engineer L4 <br />Proj Admin L3 <br />Engineer L3 <br />Engineer L3 <br />Engineer L3 <br />Engineer L3 <br />Engineer L3 <br />Proj Admin L3 <br />P roj Admin L3 <br />Proj Admin L3 <br />P roi Admin L3 <br />J. Jessen <br />B Schock, PE, AICP, RSP, ENV SP <br />C. Cavallo, PE <br />J. Palmer, PE, PTOE <br />Cost Rate <br />per hour <br />$113.08 <br />$88.88 <br />$87.78 <br />$87.78 <br />$87.78 <br />$108.17 <br />$79.33 <br />$91.35 <br />$77.16 <br />$74 28 <br />$68.03 <br />$68.03 <br />$62 88 <br />$62.40 <br />$59.13 <br />$53.70 <br />$53.70 <br />Audit <br />Overhead <br />Rate <br />1.57.03% <br />$178 25 <br />$140.10 <br />$138.37 <br />$138.37 <br />$138.37 <br />$170.51 <br />$125.05 <br />$144.00 <br />$121.63 <br />$117.09 <br />$107 24 <br />$107 24 <br />$99.12 <br />Page 7 of 7 2/17/2021 <br />Fee <br />%oflab <br />30% <br />$33.92 <br />$26.66 <br />$26.33 <br />$26.33 <br />$26.33 <br />$32 45 <br />$23.80 <br />$27.41 <br />$23.15 <br />$22 28 <br />$20.41 <br />$20.41 <br />$18.86 <br />$98.36 <br />$93.21 <br />$84.65 <br />$84.65 <br />$18.72 <br />$17.74 <br />$16.11 <br />$16.11 <br />M. Fry, PE <br />B Kinney, PE <br />B. Sisco <br />A. Corea <br />J. Chan, PE <br />K. Leingang, PE <br />P. Sharman, PE <br />T. Cheng, PE <br />$51.68 <br />$50.24 <br />$49.52 <br />$47.79 <br />$46.73 <br />$46.73 <br />$46.73 <br />$46.73 <br />$81.46 <br />$79.19 <br />$78.06 <br />$75.33 <br />$73.66 <br />$73.66 <br />$73.66 <br />$73.66 <br />K. Patterson <br />T. Le, PE <br />J. Lambert, PE <br />M. Whalen, PE <br />F. Liburdy, EIT <br />T. Nguyen, PE <br />M B u rn ette <br />C Duncan <br />I. Renfroe <br />C. Feingold <br />Engineer L2 <br />Engineer L2 <br />Engineer L2 <br />Engineer L2 <br />Engineer L2 <br />Engineer L2 <br />Analyst L2 <br />Engineer L2 <br />Analyst L2 <br />Engineer L1 <br />Engineer L1 <br />Analyst L1 <br />P roj Admin L1 <br />Intern L1 <br />Intern LI <br />Intern a‘toftccAliKelfiVPNGI <br />J. Hild, PE <br />D Li, PE, PTOE <br />M. Alzeir, EIT <br />K. Cassias, PE <br />J. Shuster, EIT <br />D. Nkeiruka, EIT <br />S . Huang <br />N . Gorman, EIT <br />N . Jones <br />$43.75 <br />$43.08 <br />$42.12 <br />$40.87 <br />$40.14 <br />$40.14 <br />$37.88 <br />$35.58 <br />$34.13 <br />$32 69 <br />$40.63 <br />$39.42 <br />$37.88 <br />$36.63 <br />$35.14 <br />$35.14 <br />$34.52 <br />$34.13 <br />$26.92 <br />$31.73 <br />$31.73 <br />$24.04 <br />$20.63 <br />$18.00 <br />$18.00 <br />NIFY4VITM PROJFCTS\3744 California Btcvc 1� <br />adnr\100 §6aFCT ►A • <br />$68.96 <br />$67.91 <br />$66.39 <br />$64.42 <br />$63.27 <br />$63.27 <br />$59.71 <br />$56.08 <br />$53.80 <br />$51.53 <br />$64.05 <br />$62 14 <br />$59.71 <br />$57.74 <br />$55.39 <br />$55.39 <br />$54.41 <br />$53.80 <br />$42.43 <br />$15.50 <br />$15.07 <br />$14.86 <br />$14.34 <br />$14.02 <br />$14.02 <br />$14.02 <br />$14.02 <br />$13.13 <br />$12 92 <br />$12 64 <br />$12 26 <br />$12 04 <br />$12 04 <br />$11.36 <br />$10.67 <br />$10.24 <br />$9.81 <br />filling Rate <br />hoer <br />$325 25 <br />$255.65 <br />$252 48 <br />$252 48 <br />$252 48 <br />$311.13 <br />$228.18 <br />$262 75 <br />$221.94 <br />$213.65 <br />$195.67 <br />$195.67 <br />$180.86 <br />$179.48 <br />$170.08 <br />$154.46 <br />$154.46 <br />$12.19 <br />$11.83 <br />$11.36 <br />$10.99 <br />$10.54 <br />$10.54 <br />$10.36 <br />$10 24 <br />$8.08 <br />$148.65 <br />$144.51 <br />$142 43 <br />$137.46 <br />$134.41 <br />$134.41 <br />$134.41 <br />$134.41 <br />$ 125.84 <br />$123.91 <br />$121.15 <br />$117.55 <br />$115.45 <br />$115.45 <br />$108.95 <br />$102 34 <br />$98.17 <br />$94.03 <br />$116.86 <br />$113.38 <br />$108.95 <br />$105.36 <br />$101.07 <br />$101.07 <br />$99.29 <br />$98.17 <br />$77.43 <br />J. Lo, EIT <br />V. Mach, EIT <br />J Den Haan <br />E Halbert <br />E Ortega <br />N . Lutenko <br />$50.02 <br />$50.02 <br />$37.89 <br />$32 52 <br />$28.37 <br />$28.37 <br />$9.52 <br />$9.52 <br />$7.21 <br />$6.19 <br />$5.40 <br />$5.40 <br />$91 26 <br />$91.26 <br />$69.15 <br />$59.34 <br />$51.77 <br />$51.77 <br />T\.02 <br />CONSULTING CONTRACTS\Design\TranspoGroupContract_v4\CM 0420 Fee Estimate - Phase 1 Cost Plus Rate <br />Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.