My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 layout and preliminary spotting of pavement markings, including any <br /> I 2 resurveying, checking, correction of errors, replacement of missing or damaged <br /> 3 markings, and coordination efforts. <br /> 4 <br /> I 5 8-22.3(2) Preparation of Roadway Surfaces <br /> 6 <br /> 7 Section 8-22.3(2) is supplemented with the following: <br /> I 8 <br /> 9 (******) <br /> 10 <br /> 11 Apply materials to new HMA that is sufficiently cured according to the manufacturer's <br /> 12 recommendation. Permanent paint marking material applied to new HMA require a <br /> 13 pavement cure period of at least 21 days. Permanent Type D marking material <br /> I 14 applied to new HMA require a pavement cure period of at least 10 days. <br /> 15 <br /> 16 8-22.4 Measurement <br /> 17 <br /> I 18 Section 8-22.4 is supplemented read as follows: <br /> 19 <br /> I20 (******) <br /> 21 The measurement of crosswalk line and stop line will be based on the linear foot of 24" <br /> 22 wide marking installed. <br /> I 23 <br /> 24 The measurement of sharrow symbol will be per each for each marker installed. <br /> 25 <br /> I 26 8-22.5 Payment <br /> 27 <br /> 28 Section 8-22.5 is supplemented read as follows: <br /> I 29 <br /> 30 (******) <br /> I 31 "24" Plastic Crosswalk Line", per Linear Foot. <br /> 32 <br /> 33 "24" Plastic Stop Line", per Linear Foot. <br /> I 34 <br /> 35 "Sharrow", per Each. <br /> 36 <br /> I 37 <br /> 38 CNH 8-23.DOCX <br /> 39 8-23 TEMPORARY PAVEMENT MARKINGS <br /> I 40 <br /> 41 8-23.2 Materials <br /> 42 <br /> I 43 Section 8-23.2 is supplemented read as follows: <br /> 44 <br /> 45 (**-**) <br /> I46 Materials for temporary markings shall be paint or reflectorized aluminum tape, as <br /> 47 directed by the Engineer and selected from approved materials listed in the Qualified <br /> 48 Products List. <br /> 49 <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 83 OF 84 DIVISION T <br /> WORK ORDER 3751 Addendum 1 APRIL 5,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.