My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 2 5-04.3(10)A HMA Compaction — General Compaction Requirements <br /> 3 Compaction shall take place when the mixture is in the proper condition so that no undue <br /> I 4 displacement, cracking, or shoving occurs. Areas inaccessible to large compaction <br /> 5 equipment shall be compacted by other mechanical means. Any HMA that becomes <br /> 6 loose, broken, contaminated, shows an excess or deficiency of asphalt, or is in any way <br /> 7 defective, shall be removed and replaced with new hot mix that shall be immediately <br /> 8 compacted to conform to the surrounding area. <br /> 9 <br /> I 10 The type of rollers to be used and their relative position in the compaction sequence <br /> 11 shall generally be the Contractor's option, provided the specified densities are attained. <br /> 12 Unless the Engineer has approved otherwise, rollers shall only be operated in the static <br /> 13 mode when the internal temperature of the mix is less than 175°F. Regardless of mix <br /> 14 temperature, a roller shall not be operated in a mode that results in checking or cracking <br /> 15 of the mat. Rollers shall only be operated in static mode on bridge decks. <br /> I 16 <br /> 17 5-04.3(10)B HMA Compaction — Cyclic Density <br /> 18 Low cyclic density areas are defined as spots or streaks in the pavement that are less <br /> I 19 than 90 percent of the theoretical maximum density. At the Engineer's discretion, the <br /> 20 Engineer may evaluate the HMA pavement for low cyclic density, and when doing so will <br /> 21 follow WSDOT SOP 733. A $500 Cyclic Density Price Adjustment will be assessed for <br /> I 22 any 500-foot section with two or more density readings below 90 percent of the <br /> 23 theoretical maximum density. <br /> 24 <br /> I 25 5-04.3(10)C Vacant <br /> 26 <br /> 27 5-04.3(10)D HMA Nonstatistical Compaction <br /> 1 28 <br /> 29 5-04.3(10)D1 HMA Nonstatistical Compaction — Lots and Sublots <br /> 30 HMA compaction which is accepted by nonstatistical evaluation will be based on <br /> 31 acceptance testing performed by the Contracting Agency dividing the project into <br /> 32 compaction lots. <br /> I 33 <br /> 34 A lot is represented by randomly selected samples of the same mix design that will be <br /> 35 tested for acceptance. A lot is defined as the total quantity of material or work produced <br /> I 36 for each Job Mix Formula placed. Only one lot per JMF is expected. A sublot shall be <br /> 37 equal to one day's production or 400 tons, whichever is less except that the final sublot <br /> 38 will be a minimum of 200 tons and may be increased to 800 tons. Testing for compaction <br /> I 39 will be at the rate of 5 tests per sublot per WSDOT T 738. <br /> 40 <br /> 41 The sublot locations within each density lot will be determined by the Engineer. For a lot <br /> I 42 in progress with a CPF less than 0.75, a new lot will begin at the Contractor's request <br /> 43 after the Engineer is satisfied that material conforming to the Specifications can be <br /> 44 produced. <br /> I45 <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 63 OF 84 DIVISION T <br /> IWORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.