My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 HMA mixture accepted by commercial evaluation and HMA constructed under conditions <br /> 2 other than those listed above shall be compacted on the basis of a test point evaluation <br /> 3 of the compaction train. The test point evaluation shall be performed in accordance with <br /> 4 instructions from the Engineer. The number of passes with an approved compaction <br /> 5 train, required to attain the maximum test point density, shall be used on all subsequentIl <br /> 6 paving. <br /> 7 <br /> 8 HMA for preleveling shall be thoroughly compacted. HMA that is used to prelevel wheel <br /> 9 ruts shall be compacted with a pneumatic tire roller unless otherwise approved by the <br /> 10 Engineer. <br /> 11 I <br /> 12 5-04.3(10)D2 HMA Compaction Nonstatistical Evaluation —Acceptance Testing <br /> 13 The location of the HMA compaction acceptance tests will be randomly selected by the <br /> II <br /> 14 Engineer from within each sublot, with one test per sublot. <br /> 15 <br /> 16 5-04.3(10)D3 HMA Nonstatistical Compaction — Price Adjustments I <br /> 17 For each compaction lot with one or two sublots, having all sublots attain a relative <br /> 18 density that is 91 percent of the reference maximum density the HMA shall be accepted <br /> 19 at the unit Contract price with no further evaluation. When a sublot does not attain a <br /> 20 relative density that is 91 percent of the reference maximum density, the lot shall be <br /> 21 evaluated in accordance with Section 1-06.2 to determine the appropriate CPF. The <br /> 22 maximum CPF shall be 1.00, however, lots with a calculated CPF in excess of 1.00 will <br /> 23 be used to offset lots with CPF values below 1.00 but greater than 0.90. Lots with CPF 111 <br /> 24 lower than 0.90 will be evaluated for compliance per 5-04.3(11). Additional testing by <br /> 25 either a nuclear moisture-density gauge or cores will be completed as required to provide 1 <br /> 26 a minimum of three tests for evaluation. <br /> 27 <br /> 28 For compaction below the required 91% a Non-Conforming Compaction Factor (NCCF) <br /> 29 will be determined. The NCCF equals the algebraic difference of CPF minus 1.00 <br /> 30 multiplied by 40 percent. The Compaction Price Adjustment will be calculated as the <br /> 31 product of CPF, the quantity of HMA in the compaction control lot in tons, and the unit <br /> 32 Contract price per ton of mix. <br /> 33 <br /> 34 5-04.3(11) Reject Work <br /> 35 <br /> 36 5-04.3(11)A Reject Work General <br /> 37 Work that is defective or does not conform to Contract requirements shall be rejected. <br /> 38 The Contractor may propose, in writing, alternatives to removal and replacement of <br /> 39 rejected material. Acceptability of such alternative proposals will be determined at the <br /> 40 sole discretion of the Engineer. HMA that has been rejected is subject to the <br /> 41 requirements in Section 1-06.2(2) and this specification, and the Contractor shall submit <br /> 42 a corrective action proposal to the Engineer for approval. <br /> 43 I <br /> 44 5-04.3(11)B Rejection by Contractor <br /> 45 The Contractor may, prior to sampling, elect to remove any defective material and <br /> 46 replace it with new material. Any such new material will be sampled, tested, and <br /> 47 evaluated for acceptance. • <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 64 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.