My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 then be carefully painted with hot asphalt cement or asphalt emulsion and shall be <br /> 2 immediately covered with dry paving sand before the asphalt cement solidifies. <br /> 3 <br /> 4 The inside throat of the structure shall be thoroughly mortared and plastered through <br /> 5 to the outside of the structure's concrete adjustment rings. I <br /> 6 <br /> 7 Castings that need replacement shall be identified by the City of Everett. <br /> 8 Replacement casting will be supplied by the City of Everett and original casting will I <br /> 9 be picked up by the City of Everett. <br /> 10 <br /> 11 <br /> 12 GLF 7-05.3(5).DOCX <br /> 13 Adjusting Valve Boxes to Grade <br /> 14 (******) I <br /> 15 <br /> 16 Section 7-05.3 of the standard specifications is supplemented with the following: <br /> 17 <br /> 18 (******) <br /> 19 Where shown in the plans, existing valve boxes and covers shall be adjusted to the I <br /> 20 grade as staked or otherwise designated by the Engineer. The adjustment of the <br /> 21 valve box to grade by the use of riser rings is not allowed. <br /> 22 <br /> 23 Removal operations shall be conducted to prevent damage to the valve boxes. Any <br /> 24 parts or materials damaged due to the Contractor's operations shall be replaced at <br /> 25 the Contractor's expense. <br /> 26 <br /> 27 The Contractor shall conduct the valve box adjustments so that the fully-adjusted box <br /> 28 allows the respective valve to be fully operational. The Contractor shall remove all <br /> 29 debris from the adjusted valve boxes to ensure such operational condition. <br /> 30 <br /> 31 Castings that need replacement shall be identified by the City of Everett. <br /> 32 Replacement casting will be supplied by the City of Everett and original casting will 111 <br /> 33 be picked up by the City of Everett. <br /> 35 <br /> 35111 <br /> 36 <br /> 37 GLF 7-05.4.DOCX <br /> 38 7-05.4 Measurement <br /> 39 <br /> 40 Section 7-05.4 of the standard specifications is deleted and replaced with the following: <br /> 41 1 <br /> 42 (******) <br /> 43 "Adjust Manhole to Grade", shall be measured per each. ' <br /> 44 <br /> 45 "Adjust Catch Basin/Inlet to Grade", shall be measured per each. <br /> 46 <br /> 47 "Adjust Valve Box to Grade", shall be measured per each. <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 72 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.