Laserfiche WebLink
1 <br /> I 2 <br /> 3 GLF 7-05.5.DOCX <br /> 4 7-05.5 Payment <br /> I5 <br /> 6 Section 7-05.5 of the standard specifications is deleted and replaced with the following: <br /> 7 <br /> 8 (******) <br /> 9 Payment will be made for each of the following bid items that are included in the proposal: <br /> I 10 <br /> 11 "Adjust Manhole to Grade", per each. <br /> 12 <br /> 13 "Adjust Catch Basin/Inlet to Grade", per each. <br /> 14 <br /> 15 "Adjust Valve Box to Grade", per each. <br /> 16 <br /> 17 The payment for"Adjust Manhole to Grade", "Adjust Catch Basin/Inlet to Grade", shall be <br /> 18 full compensation for all costs necessary to make the adjustment including temporary <br /> 19 cover to adjust the existing structure to required elevation, construction of the asphalt <br /> 20 transition around the structure, and restoration of the adjacent area. Adjustment of any <br /> 21 structures twice will be paid as one adjustment. <br /> 22 <br /> 23 END DIVISION7.RTF <br /> 24 <br /> 25 END DIVISION 7 <br /> I 26 <br /> 1 <br /> I <br /> I <br /> r <br /> r <br /> I <br /> 1 <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 73 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />