My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> BID PROPOSAL <br /> CITY OF EVERETT, WASHINGTON <br /> 2021 PAVEMENT MAINTENANCE OVERLAY I <br /> W.O. 3751 <br /> Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between I <br /> the unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to <br /> conform thereto. All entries must be typed or entered in ink. I <br /> BIDDER NAME Lakes/de -Lays-1 Ives, Inc <br /> BID ADDITIVE I <br /> THIS SCHEDULE WILL BE AWARDED BASED ON ADEQUATE FUNDING <br /> SCHEDULE D - LOWELL ROAD I <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> 1. 1 Mobilization $ 10 , 000 • 00 $ i/0 000 . QC <br /> Lump Sum Per L.S. I <br /> 2. 285 Flaggers(Minimum Bid $ 0 . CO $ ir?, l is-- . o o <br /> Hour Prevailing Wage) Per Hour I <br /> 3. 1 Project Temporary Traffic $ t-(/ a v . 00 $ Off( CO . 00 <br /> Lump Sum Control Per LA. I <br /> 4. 928 HMA Class 1/2 Inch, PG 64- $ ° . S—O $1 4 7D q . O o <br /> Ton 22 Per Ton I <br /> 5. 10 Adjust Manhole to Grade $ c—O . 00 $ 5-00 . 00 I <br /> Each Per Each <br /> 6. 5 Adjust Catch Basin/Inlet to $ 5-0 . 00 $ 2S-0 . o O I <br /> Each Grade Per Each <br /> 7. 7 Adjust Valve Box to Grade $ 5-0 . o0 $ 3 Sa . 0'V I <br /> Each Per Each <br /> 8. 2 Adjust Existing Monument $ S0 .00 $ f D O . 0 O I <br /> Each Castings to Grade Per Each <br /> I <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY SCHEDULE D DIVISION P I <br /> WORK ORDER 3751 MARCH 29, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.