My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> I 9. 7,572 Planing Bituminous $ .3 . 5O $ 2 t{l 1187 . c o <br /> Square Yard Pavement (2" Deep) Per S.Y. <br /> 1 10. 1,136 Additional Planing $ 0 . 15 - $ / O . 1r 0 <br /> Square Yard Bituminous Pavement Per S.Y. <br /> I11. 0 Vehicle Loop Detectors $ 0 • 00 $ 0 • 00 <br /> Linear Foot Per L.F. <br /> I12. 0 Loop Lead-In Detector Cable $ 0 • 00 $ 0 • 00 <br /> Linear Foot Per L.F. <br /> I13. 0 Conduit Pipe, 2" Diameter $ 0 • 00 $ 0 • 00 <br /> Linear Foot Per L.F. <br /> I14. 8,300 Temporary Pavement $ 0 • c'r $ _l c-C . e D <br /> Linear Foot Markings Per L.F. <br /> I15. 0 Plastic Wide Line $ 0 • 00 $ 0 • 00 <br /> I <br /> Linear Foot Per L.F. <br /> 16. 0 Plastic Traffic Arrow $ 0 • 00 $ 0 • 00 <br /> IEach Per Each <br /> 17. 60 24" Plastic Crosswalk Line $ /G . 3C- $ 'if . Oa <br /> ILinear Foot Per L.F. <br /> 18. 123 24" Plastic Stop Bar $ /0 • ?t) $ /31'c • 70 <br /> ILinear Foot Per L.F. <br /> 19. 0 Paint Line $ 0 • 00 $ 0 • 00 <br /> 1 Linear Foot Per L.F. <br /> I 20. 7,352 Plastic Line $ / • 3r- $ �� 25"--- . 2-0 <br /> Linear Foot Per L.F. <br /> I <br /> 21. 0 Plastic Traffic Letter $ 0 • 0 0 $ 0 • Q0 <br /> Each Per Each <br /> I <br /> I <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY SCHEDULE D DIVISION P <br /> WORK ORDER 3751 MARCH 29, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.