My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> IBID PROPOSAL <br /> CITY OF EVERETT, WASHINGTON <br /> I2021 PAVEMENT MAINTENANCE OVERLAY <br /> W.O. 3751 <br /> INote: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between <br /> the unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to <br /> 1 conform thereto. All entries must be typed or entered in ink. <br /> BIDDER NAME i•-•q Ke5/de .T odueS'/e5, The. <br /> I BID ADDITIVE <br /> THIS SCHEDULE WILL BE AWARDED BASED ON ADEQUATE FUNDING <br /> ISCHEDULE G - COLBY ALLEYS <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY <br /> ITEM DESCRIPTION <br /> (FIGURES) (FIGURES) <br /> OD <br /> 1. 1 Mobilization $ $ 000 co <br /> I <br /> Lump Sum Per L.S. <br /> 2. 167 Flaggers (Minimum Bid $ 6 3 . CO $ /0 5-2/ 0 O <br /> Hour Prevailing Wage) Per Hour <br /> I <br /> 3, 1 Project Temporary Traffic $ „„/ 0 G 0 • o O $ 3 00 0 • 0 0 <br /> Lump Sum Control Per L.S. <br /> I 4, 374 HMA Class 1/2 Inch, PG 64- $ 80 . JO $ 70 / 0 7 . Go <br /> Ton 22 Per Ton <br /> I5. 14 Adjust Manhole to Grade $ Sa • G 0 $ 70 ° .©6 <br /> Each Per Each <br /> 1 6. 14 Adjust Catch Basin/Inlet to $ • 0 ° $ 700 <br /> Each Grade Per Each <br /> 7. 7 Adjust Valve Box to Grade $ so • o a $ 3 S o . 0 0 <br /> Each Per Each <br /> I8. 2 Adjust Existing Monument $ 5—0 • o o $ /0 0 . 00 <br /> Each Castings to Grade Per Each <br /> I <br /> I 2021 PAVEMENT MAINTENANCE OVERLAY SCHEDULE G DIVISION P <br /> WORK ORDER 3751 MARCH 29, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.