My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ITEM PLAN AMOUNT TOTAL AMOUNT I <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> 9. 3,055 Planing Bituminous $ 3 . 30 $ /ate 0 8 f . 5-0 <br /> Square Yard Pavement (2" Deep) Per S.Y. <br /> 10. 458 Additional Planing $ '0 • /S $ io 8 . 76 I <br /> Square Yard Bituminous Pavement Per S.Y. <br /> 11. 0 Vehicle Loop Detectors $ 0 • 0 0 $ Q • OD <br /> Linear Foot Per L.F. <br /> 12. 0 Loop Lead-In Detector Cable $ 0 • 00 $ 0 • on I <br /> Linear Foot Per L.F. <br /> 13. 0 Conduit Pipe,2" Diameter $ © • 00 $ 0 • p0 I <br /> Linear Foot Per L.F. <br /> 14. 0 Temporary Pavement $ Q • 0D $ 0 • 0 0 I <br /> Linear Foot Markings Per L.F. <br /> 15. 0 Plastic Wide Line $ 0 • 00 $ 0 • 00 ' <br /> Linear Foot Per L.F. <br /> 16. 0 Plastic Traffic Arrow $ o • 09 $ 0 . 00 <br /> 111 <br /> Each Per Each I <br /> 17. 0 24" Plastic Crosswalk Line $ 0 • Q Q $ 0 . Q 0 <br /> Linear Foot Per L.F. I <br /> 18. 0 24" Plastic Stop Bar $ Q . OQ $ 0 . 06 <br /> Linear Foot Per L.F. 1 <br /> 19. 0 Paint Line $ 0 • 00 $ 0 • 00 <br /> Linear Foot Per L.F. I <br /> 20. 0 Plastic Line $ 0 • 0D $ 0 . 00 <br /> Linear Foot Per L.F. 1 <br /> 21. 0 Plastic Traffic Letter $ Q . 00 $ A • 00 I <br /> Each Per Each <br /> I <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY SCHEDULE G DIVISION P I <br /> WORK ORDER 3751 MARCH 29, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.