My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snohomish Power Equipment Barrier Machine (zipper) $72.84 7A 3K 8X View 111 <br /> Operators- Underground <br /> Sewer Et Water I <br /> Snohomish Power Equipment Batch Plant Operator, $72.84 7A 3K 8X View <br /> Operators- Underground Concrete <br /> Sewer Et Water <br /> Snohomish Power Equipment Bobcat $69.12 7A 3K 8X View I <br /> Operators- Underground <br /> Sewer Et Water <br /> Snohomish Power Equipment Brokk - Remote $69.12 7A 3K 8X View I <br /> Operators- Underground Demolition Equipment <br /> Sewer &Water <br /> Snohomish Power Equipment Brooms $69.12 7A 3K 8X View I <br /> Operators- Underground <br /> Sewer a Water <br /> Snohomish Power Equipment Bump Cutter $72.84 7A 3K 8X View I <br /> Operators- Underground <br /> Sewer &Water <br /> Snohomish Power Equipment Cableways $73.49 7A 3K 8X View 111 <br /> Operators- Underground <br /> Sewer a Water <br /> Snohomish Power Equipment Chipper $72.84 7A 3K 8X View I <br /> Operators- Underground <br /> Sewer &Water <br /> Snohomish Power Equipment Compressor $69.12 7A 3K 8X View <br /> Operators- Underground I <br /> Sewer Et Water <br /> Snohomish Power Equipment Concrete Finish Machine - $69.12 7A 3K 8X View <br /> Operators- Underground Laser Screed I <br /> Sewer & Water <br /> Snohomish Power Equipment Concrete Pump - Mounted $72.28 7A 3K 8X View <br /> Operators- Underground Or Trailer High Pressure 111 <br /> Sewer Et Water Line Pump, Pump High <br /> Pressure <br /> Snohomish Power Equipment Concrete Pump: Truck $73.49 7A 3K 8X View <br /> Operators- Underground Mount With Boom <br /> Sewer &Water Attachment Over 42 M <br /> Snohomish Power Equipment Concrete Pump: Truck $72.84 7A 3K 8X View <br /> Operators- Underground Mount With Boom IIISewer a Water Attachment Up To 42m <br /> Snohomish Power Equipment Conveyors $72.28 7A 3K 8X View <br /> Operators- Underground <br /> Sewer a Water <br /> Snohomish Power Equipment Cranes friction: 200 tons $75.72 7A 3K 8X View <br /> Operators- Underground and over I <br /> Sewer & Water <br /> Snohomish Power Equipment Cranes: 100 tons through $74.22 7A 3K 8X View <br /> Operators- Underground 199 tons, or 150' of boom <br /> Sewer &Water (including jib with <br /> attachments) <br /> Snohomish Power Equipment Cranes: 20 Tons Through $72.84 7A 3K 8X View <br /> Operators- Underground 44 Tons With Attachments <br /> Sewer & Water <br /> Snohomish Power Equipment Cranes: 200 tons- 299 $74.99 7A 3K 8X View <br /> Operators- Underground tons, or 250' of boom I <br /> Sewer a Water including jib with <br /> attachments <br /> Snohomish Power Equipment Cranes: 300 tons and over $75.72 7A 3K 8X View <br />
The URL can be used to link to this page
Your browser does not support the video tag.