My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Operators- Underground or 300' of boom including <br /> Sewer a Water jib with attachments <br /> I Snohomish Power Equipment Cranes: 45 Tons Through $73.49 7A 3K 8X View <br /> Operators- Underground 99 Tons, Under 150' Of <br /> Sewer Et Water Boom (including Jib With <br /> I <br /> Attachments) <br /> Snohomish Power Equipment Cranes: A-frame - 10 Tons $69.12 7A 3K 8X View <br /> Operators- Underground And Under <br /> Sewer Et Water <br /> ISnohomish Power Equipment Cranes: Friction cranes $74.99 7A 3K 8X View <br /> Operators- Underground through 199 tons <br /> Sewer Et Water <br /> I Snohomish Power Equipment Cranes: through 19 tons $72.28 7A 3K 8X View <br /> Operators- Underground with attachments, A- <br /> Sewer Et Water frame over 10 tons <br /> I Snohomish Power Equipment Crusher $72.84 7A 3K 8X View <br /> Operators- Underground <br /> Sewer Et Water <br /> 1 Snohomish Power Equipment Deck Engineer/Deck $72.84 7A 3K 8X View <br /> Operators- Underground Winches (power) <br /> Sewer Et Water <br /> Snohomish Power Equipment Derricks, On Building $73.49 7A 3K 8X View <br /> I Operators- Underground Work <br /> Sewer Et Water <br /> Snohomish Power Equipment Dozers D-9 Et Under $72.28 7A 3K 8X View <br /> I Operators- Underground <br /> Sewer Et Water <br /> Snohomish Power Equipment Drill Oilers: Auger Type, $72.28 7A 3K 8X View <br /> I Operators- Underground Truck Or Crane Mount <br /> Sewer Et Water <br /> Snohomish Power Equipment Drilling Machine $74.22 7A 3K 8X View <br /> I Operators- Underground <br /> Sewer Et Water <br /> Snohomish Power Equipment Elevator And Man-lift: $69.12 7A 3K 8X View <br /> Operators- Underground Permanent And Shaft <br /> ISewer Et Water Type <br /> Snohomish Power Equipment Finishing Machine, $72.84 7A 3K 8X View <br /> Operators- Underground Bidwell And Gamaco Et <br /> I Sewer Et Water Similar Equipment <br /> Snohomish Power Equipment Forklift: 3000 Lbs And $72.28 7A 3K 8X View <br /> Operators- Underground Over With Attachments <br /> I Sewer Et Water <br /> Snohomish Power Equipment Forklifts: Under 3000 Lbs. $69.12 7A 3K 8X View <br /> Operators- Underground With Attachments <br /> Sewer Et Water <br /> I <br /> Snohomish Power Equipment Grade Engineer: Using $72.84 7A 3K 8X View <br /> Operators- Underground Blue Prints, Cut Sheets, <br /> Sewer Et Water Etc <br /> I Snohomish Power Equipment Gradechecker/Stakeman $69.12 7A 3K 8X View <br /> Operators- Underground <br /> Sewer Et Water <br /> 1 Snohomish Power Equipment Guardrail Punch $72.84 7A 3K 8X View <br /> Operators- Underground <br /> Sewer Et Water <br /> I Snohomish Power Equipment Hard Tail End Dump $73.49 7A 3K 8X View <br /> Operators- Underground Articulating Off- Road <br /> Sewer Et Water Equipment 45 Yards. Et <br /> Over <br />
The URL can be used to link to this page
Your browser does not support the video tag.