Laserfiche WebLink
I <br /> I <br /> Division 8 1 <br /> Remove existing pages 77 - 84, dated March 29, 2021 and replace the following pages of the <br /> Special Provisions: I <br /> • Division 8 pages 77—84, of Addendum 1, dated April 5, 2021, the follow the following <br /> language clarifications: <br /> o 8-20.3(6) has been changed to clarify language: <br /> ■ Clarification language in regard to Replace Junction Box <br /> ■ Remove reference to Replace Concrete Sidewalk <br /> o 8-20.4 and 8-20.5 has been changed to add: <br /> ■ "Replace Junction Box," as a measurement and payment item. <br /> o 8-22.3 has been changed to clarify language: <br /> ■ Remove profile plastic language <br /> ■ All white parking lines shall be plastic line <br /> ■ Add references to railroad crossing symbols and sharrow symbols <br /> o 8-20.4 and 8-20.5 has been changed to add: <br /> ■ "Sharrow," as a measurement and payment item. <br /> 111 <br /> PLANS I <br /> Page 2, detail, "Typical Parking Layout Detail," change the one paint line to plastic line. All <br /> parking striping shall be plastic line. <br /> All other requirements of the plans and specifications remain in effect. <br /> This addendum shall be attached to and made a part of the plans and specifications and shall be <br /> acknowledged on the bidder's proposal. <br /> Sincerely, <br /> 111 <br /> 4/4/7 <br /> Gael L. Fisk, P.E. I <br /> Project Engineer <br /> I <br /> Attachments: Special Provisions (pages referenced above) <br /> nom <br /> Page 2 of 2 <br /> I <br />