My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 also contain a stranded copper drain wire and shall be individually shielded with <br /> I 2 an aluminum polyester foil shield. <br /> 3 <br /> 4 8-20.3.GR8 <br /> I 5 Construction Requirements <br /> 6 <br /> 7 8-20.3(6),INST1.DOCX <br /> 1 8 8-20.3(6)Junction Boxes, Cable Vaults, and Pull Boxes <br /> 9 <br /> 10 Section 8-20.3(6) is supplemented with the following: <br /> I11 <br /> 12 (******) <br /> I 13 Where called for in the Plans, Standard Duty concrete junction boxes and cable vault <br /> 14 lid assemblies shall be installed in sidewalks, walkways and shared use paths. The <br /> 15 junction boxes and lid assemblies shall be installed and adjusted to be flush with the <br /> 16 preexisting surface before removal and match grade of the preexisting sidewalk, <br /> I17 walkway and shared use path. Cable vault lid assemblies shall be installed on <br /> 18 existing cable vaults. Any sawcutting or grouting necessary to adjust the lid assembly <br /> 19 to grade is included in the Work. <br /> I 20 <br /> 21 Concrete junction boxes and cable vault lid assemblies will be City supplied. <br /> 22 Concrete junction boxes will have slip resistant surfaces and load bearing rings will <br /> I 23 be provided. <br /> 24 <br /> 25 The Contractor shall adjust existing junction box to new grade in accordance to City <br /> I 26 of Everett Standard Drawing 808 and shall be of the type indicated in the plans. The <br /> 27 adjustment operations shall be conducted to prevent damage to any conduits. All <br /> 28 parts or materials damaged as a result of the Contractor's operations shall be <br /> I 29 replaced at no expense to the Contracting Agency. If junction box adjustment <br /> 30 involves conduit modification, as determined by the Engineer, payment will be made <br /> 31 in accordance with Section 1-09.6. <br /> 32 <br /> 1 33 All junction boxes and vaults placed in sidewalk or pedestrian path shall meet a gap <br /> 34 acceptance requirement of no more than 1/2" wide with greater than 1/4" deep <br /> 35 depression. <br /> I 36 <br /> 37 All costs associated with replacing junction boxes or cable vault lid assemblies, <br /> 38 including excavation and installation of junction box load bearing rings, intermediate <br /> 39 and final adjustment to grade, saw cutting or grouting of existing vaults, or other work <br /> 40 to install the junction box in the sidewalk, shall be included in the associated bid item <br /> 41 for Replace Junction Box. <br /> 1 42 <br /> 43 <br /> 44 8-20.3(14).GR8 <br /> I 45 Signal Systems <br /> 46 <br /> 47 8-20.3(14),INSTI.GR8 <br /> 48 Section 8-20.3(14) is supplemented with the following: <br /> 49 <br /> 1 <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 77 OF 84 DIVISION T <br /> WORK ORDER 3751 Addendum 1 APRIL 5,2021 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.