My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 5-04.3(9)C4 Mixture Nonstatistical Evaluation - Pay Factors 57 <br /> I2 5-04.3(9)C5 Vacant 58 <br /> 3 5-04.3(9)C6 Mixture Nonstatistical Evaluation - Price Adjustments 58 <br /> I4 5-04.3(9)C7 Mixture Nonstatistical Evaluation - Retests 58 <br /> 5 5-04.3(9)D Mixture Acceptance - Commercial Evaluation 58 <br /> I6 5-04.3(10) HMA Compaction Acceptance 59 <br /> 7 5-04.3(10)A HMA Compaction - General Compaction Requirements 60 <br /> 1 8 5-04.3(10)B HMA Compaction - Cyclic Density 60 <br /> 9 5-04.3(10)C Vacant 61 <br /> I 10 5-04.3(10)D HMA Nonstatistical Compaction 61 <br /> 11 5-04.3(10)D1 HMA Nonstatistical Compaction - Lots and Sublots 61 <br /> 12 5-04.3(10)D2 HMA Compaction Nonstatistical Evaluation -Acceptance <br /> I13 Testing 61 <br /> 14 5-04.3(10)D3 HMA Nonstatistical Compaction - Price Adjustments 61 <br /> I15 5-04.3(11) Reject Work 62 <br /> 16 5-04.3(11)A Reject Work General 62 <br /> I17 5-04.3(11)B Rejection by Contractor 62 <br /> 18 5-04.3(11)C Rejection Without Testing (Mixture or Compaction) 62 <br /> I19 5-04.3(11)D Rejection -A Partial Sublot 63 <br /> 20 5-04.3(11)E Rejection -An Entire Sublot 63 <br /> I21 5-04.3(11)F Rejection -A Lot in Progress 63 <br /> 22 5 04.3(11)G Rejection -An Entire Lot (Mixture or Compaction) 63 <br /> I 23 5-04.3(12) Joints 63 <br /> 24 5-04.3(12)A HMA Joints 63 <br /> 25 5-04.3(12)A1 Transverse Joints 63 <br /> I26 5-04.3(12)A2 Longitudinal Joints 64 <br /> 27 5-04.3(12)B Bridge Paving Joint Seals 64 <br /> I28 5-04.3(12)B1 Sawcut and Seal 64 <br /> 29 5-04.3(12)B2 Paved Panel Joint Seal 64 <br /> I30 5-04.3(13) Surface Smoothness 64 <br /> 31 5-04.3(14) Planing (Milling) Bituminous Pavement 65 <br /> I32 5-04.3(14)A Paving and Planing Under Traffic 66 <br /> 33 5-04.3(14)A1 General 66 <br /> 34 5-04.3(15) Vacant 67 <br /> 35 5 04.3(16) HMA Road Approaches 67 <br /> I 36 5-04.4 Measurement 67 <br /> 37 5-04.4 Payment 67 <br /> I 2021 PAVEMENT MAINTENANCE OVERLAY WORK ORDER 3751 PAGE E OF G SPECIAL PROVISIONS <br /> MARCH 29, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.